Tuesday, March 13 – PM Session

Track 1

(E-1-01 to 05)
Rehabilitation/CIPP
Mo Najafi, University of Texas at Arlington/CUIRE

Track 2

(E-2-01 to 05)
Large Diameter Tunneling
Don Del Nero, CH2M HILL

Track 3

(E-3-01 to 05)
Water Rehabilitation
Keith Hanks, City of Los Angeles

Track 4

(E-4-01 to 05)
Trenchless Risk Issues
Brian Dorwart, Brierley Associates, LLC

Track 5

(E-5-01 to 05)
Condition Assessment
David Crowder, R.V. Anderson Associates Limited

3:30 PM Winter Wonderland Does Wonders to CIPP Renewal of a High Pressure Gas Main in New Jersey Tapping the Mighty Missouri Using Trenchless Methods Trenchless Renewal of Watermains Beneficial to Both the Existing Watermain and the Asphalt Pavement Investigation of Horizontal Directional Drilling Construction Risks Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study
3:55 PM A Sure Bet at Greektown Casino Installation of Two Water Tunnels Through Limestone Using a 60-in. Diameter Hard Rock Shielded TBM Trenchless Rehabilitation of Pressure Pipelines The Benefits of Post-construction Warranty Inspections for Long-term Sanitary Sewer Overflow Control Program Success Large Diameter Force Main Investigations – Two Level Approach
4:20 PM Caught Between a Bridge and a River Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling Structural Rehabilitation of Aging Pipes – Does It Really Prevent Failures? Creating High Confidence – Essential Elements for Cross Bore Elimination Projects Sustainable Infrastructure Planning For Long-term Wastewater Force Main Programs
4:45 PM Water Pipeline Deterioration Prediction Utilizing a Markov Chain Methodology Tunneling Under the Overland Park Arboretum QA/QC Procedures for Structural Rehabilitation of PCCP with CFRP Composites Construction Failure Case Study: Trenchless Sewer Line Replacement Project Grade Failure Asset Management of Asbestos Cement Pipes Using Acoustic Methods; Theory and Case Studies
5:10 PM CIPP for Structural Rehabilitation Trenchless Installation of 60-in. Sanitary Sewer Using a 72-in. Robbins Rockhead Hard Rock TBM Using CIPP Lining and Cathodic Protection to Rehabilitate and Protect Water Lines Paying Small Trenchless Projects Their Dues – A Discussion on Risk Reduction Strategies for Small Trenchless Projects Condition Assessment of Conveyance Tunnels – Effective Approaches to Managing Reliability