Track 1(E-1-01 to 05) |
Track 2(E-2-01 to 05) |
Track 3(E-3-01 to 05) |
Track 4(E-4-01 to 05) |
Track 5(E-5-01 to 05) |
|
| 3:30 PM | Winter Wonderland Does Wonders to CIPP Renewal of a High Pressure Gas Main in New Jersey | Tapping the Mighty Missouri Using Trenchless Methods | Trenchless Renewal of Watermains Beneficial to Both the Existing Watermain and the Asphalt Pavement | Investigation of Horizontal Directional Drilling Construction Risks | Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study |
| 3:55 PM | A Sure Bet at Greektown Casino | Installation of Two Water Tunnels Through Limestone Using a 60-in. Diameter Hard Rock Shielded TBM | Trenchless Rehabilitation of Pressure Pipelines | The Benefits of Post-construction Warranty Inspections for Long-term Sanitary Sewer Overflow Control Program Success | Large Diameter Force Main Investigations – Two Level Approach |
| 4:20 PM | Caught Between a Bridge and a River | Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling | Structural Rehabilitation of Aging Pipes – Does It Really Prevent Failures? | Creating High Confidence – Essential Elements for Cross Bore Elimination Projects | Sustainable Infrastructure Planning For Long-term Wastewater Force Main Programs |
| 4:45 PM | Water Pipeline Deterioration Prediction Utilizing a Markov Chain Methodology | Tunneling Under the Overland Park Arboretum | QA/QC Procedures for Structural Rehabilitation of PCCP with CFRP Composites | Construction Failure Case Study: Trenchless Sewer Line Replacement Project Grade Failure | Asset Management of Asbestos Cement Pipes Using Acoustic Methods; Theory and Case Studies |
| 5:10 PM | CIPP for Structural Rehabilitation | Trenchless Installation of 60-in. Sanitary Sewer Using a 72-in. Robbins Rockhead Hard Rock TBM | Using CIPP Lining and Cathodic Protection to Rehabilitate and Protect Water Lines | Paying Small Trenchless Projects Their Dues – A Discussion on Risk Reduction Strategies for Small Trenchless Projects | Condition Assessment of Conveyance Tunnels – Effective Approaches to Managing Reliability |