Tuesday, March 13 – AM Session (1st Session)

Track 1

(C-1-01 to 05)
Horizontal Directional Drilling
Jim Murphy, Complete Crossings Inc.

Track 2

(C-2-01 to 05)
Microtunneling
Matthew Wallin, Bennett Trenchless Engineers

Track 3

(C-3-01 to 05)
Lining Materials, Methods & Installation
John Matthews, Battelle Memorial Institute

Track 4

(C-4-01 to 05)
Pipe Bursting & Pipe Ramming
Craig Camp, Jacobs Associates

Track 5

(C-5-01 to 05)
Condition Assessment
Peter Oram, AECOM

Track 6

(C-6-01 to 05)
Current Trenchless Research & Environmental Issues
Cindy Preuss, Harris & Associates

8:00 AM Risk Mitigation Strategies for Directional Drilling Projects Microtunneling of Large Diameter Watermain in Hard Rock – Manhattan, City of New York Sewer Rehabilitation in the City of Atlanta – Past, Present and Future Failing 96-in. Diameter CMP Replaced Utilizing Pipe Ramming Technology Separating the Forest from the Trees – The Use of GIS Decision Tool to Make Intelligent Asset Decisions Interactive Web Portal for Supporting Decision Making Related to Technical, Financial and Legal Issues
8:25 AM Vancouver City Central Transmission Project – Horizontal Directional Drilling and Supply and Installation of High Density Polyethylene Duct Risk Mitigation for Portsmouth Forcemain Contributes to Record Setting Microtunneling Drive Lessons Learned During Sewer Rehabilitation on Public and Private Property Estimating Hammer Stresses for Pipe Ramming and HDD Assists Direct Benefits of Undertaking Multi-sensor Inspections for Large Diameter Sewers Trenchless Technology Applications for Culvert Installations
8:50 AM Accuracy and Predictability of Design Parameters in Horizontal Directional Drilling City of East Chicago Raw Water Pipeline – Microtunneling in Clean Sands Beneath the Water Table A New UV Sensor Method for Sewer Renovation Conductor Barrel Installation Makes Boston’s Logan Airport HDD Project a Success Using the State-of-the-art Pipeline Condition Assessment Tools to Proper Advantage Comparison of the Carbon Dioxide Emissions Between HDD and Open-cut in the Construction of One Mile Watermain and its Ancillary Structures
9:15 AM North LRT Expansion at MacEwan – 72 kV Cable Relocation Project Chemical Grout – The Settlement Solution for Microtunneling World’s First All Electronic Toll Highway Uses Trenchless Technology to Maintain High Standards Hillsborough County Florida Utilizes Varied Trenchless Methods with Success Risk-based Condition Assessment of Aqueduct Pipelines Using Multiple Inspection Technologies Carbon Reduction and the Trenchless Industry
9:40 AM The Birkdale Project: 3,420 lf of At-grade HDD in New Zealand Unconventional Subsurface Investigation Methods for Tunnel/Trenchless Projects Forensic Engineering Techniques Bridge the Gap for the 96” Diameter Elm Fork Relief Sewer Rehabilitation Project Case Studies in Regulatory¸ Legal and Design Issues in Pipe Bursting Pipeline Inspection and Locating Fiberoptic Cure Verification (FCV) Ensures Quality, Longevity of CIPP Liner Installations