Speakers

NASTT’s 2012 No-Dig Show speakers are listed in alphabetical order below.

Author Name Organization Presenter Introduction Paper ID Date Time Paper Title
Stephen Abernathy Midwest Mole¸ Inc. Steve Abernathy holds a BSME from Purdue University. His experience includes project and executive management of heavy civil construction projects. Steve Joined Midwest Mole as Vice President of Operations in 2009 and has served as Manager of large tunnel projects since March of 2010 E-2-05 Tuesday, March 13 – PM Sessions 5:10 PM Trenchless Installation of 60-in. Sanitary Sewer Using a 72-in. Robbins Rockhead Hard Rock TBM
Simaan M. AbouRizk University of Alberta D-2-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pilot Tube Microtunneling in City of Edmonton – Challenges and Successes
Vanessa Adams¸ P.E. Brown and Caldwell   A-3-03 Monday, March 12 – AM Sessions 10:20 AM CIPP for Structural Rehabilitation
    F-6-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Rehab of Sewers in the Beaver State – Design¸ Construction and Lessons Learned
Wes Adams Central Contra Costa Sanitary District B-2-01 Monday, March 12 – PM Sessions 3:45 PM Guided Boring and the Lafayette/Pleasant Hill Road Trunk Sewer
Hossein Akbarzadeh University of Alberta Hossein Akbarzadeh is PhD Student of Geotechnical Eng. at U of Alberta. He has served as VP of NASTT Student Chapter at U of Alberta since 2010. He holds MSc in Geotechnical Eng. and BSc in Civil Eng.¸ both from Iran. From 2003 to 2009¸ he worked as a faculty as well as a Certified Structural Eng.. E-4-01 Tuesday, March 13 – PM Sessions 3:30 PM Investigation of Horizontal Directional Drilling Construction Risks
      F-1-04 Wednesday, March 14 – AM Sessions 9:15 AM Impact of Earth Loads on Polyethylene Pipes Installed by Horizontal Directional Drilling
Fadi Alabbas Veolia Water Operating Services B-4-03 Monday, March 12 – PM Sessions 4:35 PM Cranking up the Delivery – City of Richmond 2011 Sanitary Sewer Lining Project
Shaurav Alam Trenchless Technology Center Senior PhD candidate and supervisor of the CIPP Research Laboratory at the Trenchless Technology Center . Louisiana Tech University¸ Mr. Alam has five years experience in the testing of CIPP liners used in a wide range of applications using ASTM and European testing standards. A-4-04 Monday, March 12 – AM Sessions 10:45 AM LinerRite – An Optical-Based Sensor for QC of Wet-Out Operations of CIPP Liners
    C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
Tarek Alkhrdaji STRUCTURAL F-4-01 Wednesday, March 14 – AM Sessions 8:00 AM Pipeline Repair Technologies, Current and Future
Erez Allouche Trenchless Technology Center A-4-02 Monday, March 12 – AM Sessions 9:55 AM Review of QA/QC Procedures Associated with Rehabilitation of Large Diameter Interceptors
    A-4-04 Monday, March 12 – AM Sessions 10:45 AM LinerRite – An Optical-Based Sensor for QC of Wet-Out Operations of CIPP Liners
    C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
    C-6-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Interactive Web Portal for Supporting Decision Making Related to Technical¸ Financial and Legal Issues
Mir Al-Masud Trenchless Technology Center C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
Rania Sarkis Amen¸ P.E. City of San Diego Rania Sarkis Amen¸ P.E. is a Senior Engineer & Section Leader for Right-of-Way Design Division at City of San Diego. Her expertise is in water & wastewater pipelines with extensive trenchless technology experience. She serves as City’s senior project manager for USIU-Miramar Trunk Sewer project. A-2-03 Monday, March 12 – AM Sessions 10:20 AM Microtunneling Gives Way to Auger Boring on Challenging Drive
Laura Anderson Akkerman Inc. B-2-03 Monday, March 12 – PM Sessions 4:35 PM Extensive Small Diameter Pipe Jacking with Concurrent Methods Under the I-15 Core in Provo¸ Utah
Tony Angelo 407ETR Concession Company Ltd Tony Angelo¸ a professional engineer with degree in civil engineering¸ is the Manager of Structures for 407ETR. He has over 20 years experience with structural design¸ bridge/culvert/structural inspections. Tony’s experience includes involvement with municipal¸ provincial and highway agencies. C-3-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM World’s First All Electronic Toll Highway Uses Trenchless Technology to Maintain High Standards
Samuel T. Ariaratnam Arizona State University F-1-03 Wednesday, March 14 – AM Sessions 8:50 AM Comparison of Buried Pipe Behavior – Open-cut vs. Directional Drilling
    F-4-02 Wednesday, March 14 – AM Sessions 8:25 AM Evaluation of the Carbon Footprint of Innovative Watermain Rehabilitation Technologies vs. Open-cut
Mary Asperger Bennett Trenchless Engineers Mary Asperger is an Associate Engineer with Bennett Trenchless Engineers¸ and has 4 years of experience in trenchless design and inspection. B-1-01 Monday, March 12 – PM Sessions 3:45 PM 50 Ft. of Peat – Design Challenges of Three HDD Crossings of the Sacramento River
Alan Atalah Bowling Green State University Dr. Atalah is an Associate Professor who teaches construction management at Bowling Green State University. He has been involved in water and wastewater projects for more than 25 years of; 18 years of which were in trenchless technology construction. Dr. Atalah earned a Doctor of Engineering¸ Mast C-6-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Comparison of the Carbon Dioxide Emissions Between HDD and Open-cut in the Construction of One Mile Watermain and its Ancillary Structures
Nii Attoh-Okine University of Delaware F-4-05 Wednesday, March 14 – AM Sessions 9:40 AM A New Approach in Pipe Structural Condition Scoring
Robert Auber Northeast Ohio Regional Sewer District Mr. Auber has over 27 years of experience in the construction of major sewer projects including large diameter tunnels and collection systems. Mr. Auber served as the senior construction supervisor for the Northeast Ohio Regional Sewer District on the Dugway East Interceptor Relief Sewer Project. F-2-04 Wednesday, March 14 – AM Sessions 9:15 AM Dugway East Interceptor Relief Sewer Hand Tunnel Crossing Installation
Brian Avon Carollo Engineers Mr. Avon¸ a Project Engineer with Carollo Engineers¸ has 5 years of experience in water and wastewater pipeline design and construction. He has a BS degree in Civil Engineering from the UOP in 2007 and in Business Administration from USC¸ and is a licensed professional engineer in California. D-1-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Garrity Creek Emergency Construction Using HDD
Frank Ayotte Hazen and Sawyer F-3-01 Wednesday, March 14 – AM Sessions 8:00 AM Old Pipe/Renewed Pipe – How New Technology Enhances the Rehabilitation of a 140-Year-Old Sewer
Kevin Bainbridge Robinson Consultants Inc Kevin is the Infrastructure Management Practice Leader for Robinson Consultants Inc. an Ottawa Ontario based engineering firm. He has over 14 years experience in municipal sewer and water infrastructure management and is responsible for the firm’s infrastructure management and buried infrastructure A-5-02 Monday, March 12 – AM Sessions 9:55 AM Condition Assessment and Management of Critical Watermains in the City of Ottawa
      E-3-03 Tuesday, March 13 – PM Sessions 4:20 PM Structural Rehabilitation of Aging Pipes – Does It Really Prevent Failures?
Ron Baker Town of Sundre B-1-02 Monday, March 12 – PM Sessions 4:10 PM Planning, Extensive Monitoring and Good Communication Solves Public Noise Concerns on Two Large HDD Crossings in Sundre, Alberta
Greg Ballard¸ P.E. Nashville Metro Water Services F-3-05 Wednesday, March 14 – AM Sessions 9:40 AM 96-in. Brick Nashville CSO Outfall Relined After Flood Damage
Chau Bao Lockwood¸ Andrews & Newnam¸ Inc. D-3-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM The installation of 42-in. Storm Sewer through Trenchless Technology in a Highly Urbanized Area for the City of Laredo. Why hand tunneling was the method of choice over the other trenchless methods evaluated?
Gerry Bauer Stantec C-5-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Direct Benefits of Undertaking Multi-sensor Inspections for Large Diameter Sewers
Alireza Bayat University of Alberta Dr. Alireza Bayat¸ PhD¸ PEng¸ is a faculty at Dept. of Civil Eng. at University of Alberta and the technical developer of BoreAidTM. He received PhD in Civil Eng. from University of Waterloo¸ MSc in Geotechnical Eng. and BSc in Civil Eng.¸ both from Sharif University of Technology¸ Iran. E-4-01 Tuesday, March 13 – PM Sessions 3:30 PM Investigation of Horizontal Directional Drilling Construction Risks
      F-1-04 Wednesday, March 14 – AM Sessions 9:15 AM Impact of Earth Loads on Polyethylene Pipes Installed by Horizontal Directional Drilling
Scott E. Belz URS Corporation Project manager at URS for over 32 years¸ specializing in I/I investigation projects. Mr. Belz has developed unique testing methods for investigating private property I/I sources. C-3-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Lessons Learned During Sewer Rehabilitation on Public and Private Property
David Bennett Bennett Trenchless Engineers David Bennett is the owner and CEO of Bennett Trenchless Engineers¸ a trenchless consulting firm. He received the Trenchless Technology Person of the Year award for 2005. He co-authored the "HDD Good Practices Guidelines" and the "Pipe Bursting Good Practices Guidelines" with Sam Ariaratnam. A-1-04 Monday, March 12 – AM Sessions 10:45 AM Improving the Standard of Mud Management
    B-1-01 Monday, March 12 – PM Sessions 3:45 PM 50 Ft. of Peat – Design Challenges of Three HDD Crossings of the Sacramento River
Steve Benton AECOM D-2-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Pilot Tube Microtunneling within Variable Ground Conditions in Cleveland, Ohio
William Bergeson AECOM Mr. Bergeson is a professional engineer with 12 years experience from AECOM on large scale geotechnical and tunneling projects. He received his MSCE from Lehigh University and his BSCE from Auburn University. Mr. Bergeson has published papers in the United States¸ India¸ Moscow¸ Berlin¸ and Canada. D-2-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Pilot Tube Microtunneling within Variable Ground Conditions in Cleveland, Ohio
Steve Bian DCWATER A-5-03 Monday, March 12 – AM Sessions 10:20 AM Lesson Learned About External Corrosion That Lead to an Outfall Sewer Collapse
John Bidigare Brownstown Township D-4-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Pipe Bursting and Pre-Chlorination: Cost Effectiveness on Large Scale Projects
Deirdre Blackard Gwinnett County Department of Water Resources A-6-01 Monday, March 12 – AM Sessions 9:30 AM Methods for Non-destructive Evaluation of Force Main Condition and the Associated Cost Benefits
Richard (Bo) Botteicher Underground Solutions¸ Inc. Mr. Botteicher had worked for 7 years in the Water and Wastewater industry as a consulting engineer in Denver¸ CO and is a licensed Professional Engineer in Colorado. He has served as a Product Engineer for Underground Solutions¸ Inc.¸ makers of Fusible PVCâ„¢¸ for the past five years. C-1-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM The Birkdale ‘B’ Project: 3,420 lf of At-grade HDD in New Zealand
Bill Boyes City of Calgary Water Services Asset Assessment Leader for City of Calgary Water Services. 34 years experience in the operation and maintenance of water and sewer systems. Founding member of NASTT NW Chapter (Canada). F-3-04 Wednesday, March 14 – AM Sessions 9:15 AM Trenchless Sewer Lateral Rehabilitation Pilot Project in Calgary, Alberta
Kyle Boyle Nothern Kentucky Sanitation District No. 1 I joined SD#1 in January of 2007 after graduating from the University of Kentucky. I currently work as a Project Manager/ Engineer in the Collection Systems. Daily duties consist of managing various capital improvement projects¸ daily collection system projects¸ and outside maintenance contractors. F-2-02 Wednesday, March 14 – AM Sessions 8:25 AM The Axis of New Trenchless Technology
Marc Bracken Echologics Engineering Inc. With more than 18 years of experience in acoustical and vibration engineering¸ Marc Bracken is vice president and general manager of Toronto-based Echologics¸ a leader in the development of acoustic technologies that non-invasively detect underground leaks and assess the condition of water pipes. E-5-04 Tuesday, March 13 – PM Sessions 4:45 PM Asset Management of Asbestos Cement Pipes Using Acoustic Methods; Theory and Case Studies
Mark Brand Insituform Technologies Limited Mark Brand is Regional Manager for the Western Canadian Operations of Insituform Technologies Ltd with experience in the CIPP industry in excess of 17 years. Mark also serves as Treasurer and Director for the Northwest Chapter of the NASTT. A-3-01 Monday, March 12 – AM Sessions 9:30 AM Just in Time Rehabilitation of Twin Steel Sewer Siphon
Debbie Bray Tulalip Tribes D-1-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Tulalip Tribe and City of Everett Bring Regional Water to the Pacific Northwest with Massive HDD Project
Mikita Browning City of Atlanta¸ Department of Watershed Managemen Ms. Browning has over eleven years of experience in civil and environmental engineering¸ specializing in sewer system evaluation and rehabilitation and wet weather program implementation and management. This includes CMOM implementation¸ SSO and CSO hydraulic analysis and modeling. C-3-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Sewer Rehabilitation in the City of Atlanta – Past¸ Present and Future
Mark Bruce Cross Bore Safety Association As the president of Can Clay Corporation he has visit pipe installation projects on several continents¸ North America¸ South America¸ Europe and Asia and as part of his company’s shipments to five continents. He holds patents and has implemented ISO 9001 quality systems for manufacturing. E-4-03 Tuesday, March 13 – PM Sessions 4:20 PM Creating High Confidence – Essential Elements for Cross Bore Elimination Projects
Tom Bryski Golder Associates C-1-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Vancouver City Central Transmission Project – Horizontal Directional Drilling and Supply and Installation of High Density Polyethylene Duct
Tim Burch WorleyParsons B-1-02 Monday, March 12 – PM Sessions 4:10 PM Planning, Extensive Monitoring and Good Communication Solves Public Noise Concerns on Two Large HDD Crossings in Sundre, Alberta
Martha Burke¸ MPA Seattle Public Utilities Martha Burke¸ an analyst for the Wastewater Division with SPU¸ has 20 years of experience working for Seattle utilities in program development and project management. She has a master’s degree in public administration (environmental management) from the University of Washington. F-5-02 Wednesday, March 14 – AM Sessions 8:25 AM Flood Grouting Sanitary Sewers for Infiltration Control
Tricia Butler¸ P.E. RMC Water and Environment B-4-02 Monday, March 12 – PM Sessions 4:10 PM High Temperature Aeration Piping – How Can I Rehabilitate It?
Joseph Butor P.E. Midwest Mole D-2-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Unique Location and Ground Conditions Call for Innovative Approach to On-grade Boring
John Cairns City of Edmonton¸ Drainage Services A-3-04 Monday, March 12 – AM Sessions 10:45 AM Innovative CIPP Relining Methods Reduce Open-cut Spot Repairs in Edmonton
Craig Camp Jacobs Associates D-2-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Lubricant Design & Management in Trenchless Pipe Installation (New paper to replace Laser Guided MT…Author dropped out).
Janet Cann¸ P.E. Spartanburg Water A-3-02 Monday, March 12 – AM Sessions 9:55 AM Back to the Future – The Modernization of A Historic Mill Village Community
Mario Carbone Progressive Pipeline Management 40 Years in the gas pipeline business¸ 10 years experience as a Senior Manager for Gas Research & Development¸ trained and certified on the applications of the Starline process¸ holds 3 US patents for new technologies for gas related systems E-1-01 Tuesday, March 13 – PM Sessions 3:30 PM Winter Wonderland does Wonders to CIPP Renewal of a High Pressure Gas Main in New Jersey
Dean Charleson Stantec Consulting Ltd. C-1-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM North LRT Expansion at MacEwan – 72 kV Cable Relocation Project
Sudhakar Cherukupalli, P.Eng. BC Hydro   F-1-05 Wednesday, March 14 – AM Sessions 9:40 AM Thermal Grouting of BC Hydro’s VCCT Project
Jason Chin Black & Veatch Corporation C-2-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM City of East Chicago Raw Water Pipeline – Microtunneling in Clean Sands Beneath the Water Table
Jinsung Cho Arizona State University Jinsung Cho is a PhD Student in the Del E. Webb School of Construction at ASU¸ and has focused his research on buried pipe behavior. This paper represents the initial results of his research work. F-1-03 Wednesday, March 14 – AM Sessions 8:50 AM Comparison of Buried Pipe Behavior – Open-cut vs. Directional Drilling
Brian Choma EPCOR Transmission Inc. C-1-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM North LRT Expansion at MacEwan – 72 kV Cable Relocation Project
Jennifer Chu¸ P.Eng. Golder Associates E-2-03 Tuesday, March 13 – PM Sessions 4:20 PM Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling
Alison St. Clair Virginia Tech Alison is a Ph.D. candidate in the Civil and Environmental Engineering Program. Her research work is in the area of condition and performance modeling of water pipeline. E-1-04 Tuesday, March 13 – PM Sessions 4:45 PM Water Pipeline Deterioration Prediction Utilizing a Markov Chain Methodology
Kenny Clever The Robbins Company Kenny Clever is the SBU Sales Manager – Eastern U.S. for the Robbins Company¸ based in Solon¸ Ohio. E-2-02 Tuesday, March 13 – PM Sessions 3:55 PM Installation of Two Water Tunnels Through Limestone Using a 60-in. Diameter Hard Rock Shielded TBM
Andrew Clothier AECOM Andrew is a graduate of Temple University¸ a Professional Engineer and Senior manager of AECOM’s Community Infrastructure Group. He has 15 years of water and wastewater engineering experience including the inspection¸ condition assessment¸ design and rehabilitation of water and sewer infrastructure E-5-03 Tuesday, March 13 – PM Sessions 4:20 PM Sustainable Infrastructure Planning For Long-term Wastewater Force Main Programs
Kevin Cole, P.Eng. City of Leduc A-6-02 Monday, March 12 – AM Sessions 9:55 AM City of Leduc – Case Study Comparison between Conventional CCTV Sewer Inspection and 360 Degree Digital Pipe Scanning Technology
Kevin Colvett City of Brentwood F-5-01 Wednesday, March 14 – AM Sessions 8:00 AM Sewer Rehab Pays in Brentwood Tennessee
Wendy E. Condit Battelle Memorial Institute F-4-02 Wednesday, March 14 – AM Sessions 8:25 AM Evaluation of the Carbon Footprint of Innovative Watermain Rehabilitation Technologies vs. Open-cut
Ken Cook West County Wastewater District D-1-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Garrity Creek Emergency Construction Using HDD
Paul Cote¸ P.E. Tata & Howard A-1-02 Monday, March 12 – AM Sessions 9:55 AM Franklin Falls – The Toughest Trenchless Crossing in New Hampshire
Jim Creager AECOM D-4-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pipe Bursting and Sliplining Reach New Levels of Production in the City of Oxnard¸ California, Through New Innovative Design, Planning, Equipment and Construction Methods
John Crippen CDM Smith D-1-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Multiple HDD Applications, Portland Airport Deicing Enhancement Project
Dawayne Crite¸ P.E. CDM A-3-02 Monday, March 12 – AM Sessions 9:55 AM Back to the Future – The Modernization of A Historic Mill Village Community
David Crowder R.V.Anderson Associates Limited David is a senior associate and Manager of the Field Services at R.V. Anderson Associates Limited¸ with over 23 years of experience on projects using trenchless technology applications¸ including condition assessments for large municipal infrastructure¸ horizontal directional drilling¸ CCTV inspection C-5-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Direct Benefits of Undertaking Multi-sensor Inspections for Large Diameter Sewers
Ray Davies City of Edmonton¸ Drainage Services Ray is the General Supervisor of Open cut section¸ Design and Construction¸ Drainage Services with the City of Edmonton. A-3-01 Monday, March 12 – AM Sessions 9:30 AM Just in Time Rehabilitation of Twin Steel Sewer Siphon
      D-2-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pilot Tube Microtunneling in City of Edmonton – Challenges and Successes
Stephen Dennehy¸ P.E. Northshore Utility District A-2-04 Monday, March 12 – AM Sessions 10:45 AM Redesigning for Success – A Challenging Sewer Installation in Kirkland¸ Washington
Henry Derr Brown and Caldwell Mr. Derr has over 38 years of experience in the planning¸ design and construction of water and wastewater facilities with a focus on the use of trenchless technologies for pipeline construction and rehabilitation. He is a Senior Associate with Brown and Caldwell and is the firm’s technical leader of A-6-03 Monday, March 12 – AM Sessions 10:20 AM Decision Logic for Selecting Wastewater Force Main Inspection Program Tools
Andy Dettmer Carollo Engineers Dr. Dettmer is lead infrastructure engineer in Carollo’s Research Group. He conducted his Ph.D. research at the Trenchless Technology Center at Louisiana Tech University where he developed advanced pipe inspection techniques for distribution and collection systems. A-4-02 Monday, March 12 – AM Sessions 9:55 AM Review of QA/QC Procedures Associated with Rehabilitation of Large Diameter Interceptors
      C-5-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Risk-based Condition Assessment of Aqueduct Pipelines Using Multiple Inspection Technologies
Umesh Dhital Trenchless Technology Center (TTC)¸ Louisiana Tech C-6-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Interactive Web Portal for Supporting Decision Making Related to Technical¸ Financial and Legal Issues
Guy Dickes Constellation Group LLC Guy has designed and supervised the numerous grouting projects for the underground utility industry. He has worked in oil refineries and nuclear power plants and has substantial experience in ground modification. Guy worked for a major repair contractor prior to starting Constellation Group LLC F-1-05 Wednesday, March 14 – AM Sessions 9:40 AM Thermal Grouting of BC Hydro’s VCCT Project
      F-2-03 Wednesday, March 14 – AM Sessions 8:50 AM Support of Tunneling with Chemical Grouting in New Jersey
Tony Dill Malcolm Pirnie B-4-01 Monday, March 12 – PM Sessions 3:45 PM Lateral Rehabilitation Options and Their Cost-benefit comparison – One Utility’s Perspective
William DiTullio InfraMetrix¸ LLC A-5-05 Monday, March 12 – AM Sessions 11:10 AM Applying Risk Management and Financial Analysis to Asset Management Planning
Dennis J. Doherty Haley & Aldrich C-1-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Accuracy and Predictability of Design Parameters in Horizontal Directional Drilling
Ian Doherty Trenchless Design Engineering Ian Doherty¸ a professional engineer¸ specialized in trenchless rehabilitation of water and wastewater pipelines for 22 years. In 1993 he started Trenchless Design Engineering Ltd. He is a regular instructor for the NASTT CIPP design & construction course and has presented several No-Dig papers. C-3-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM World’s First All Electronic Toll Highway Uses Trenchless Technology to Maintain High Standards
Steven K Donovan¸ PE SHN Consulting Engineers & Geologists¸ Inc. Mr. Donovan is a registered professional civil and environmental engineer who has been actively consulting¸ designing¸ and providing construction support services on HDD projects for Owners and Contractors for the past 16 years. C-1-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Risk Mitigation Strategies for Directional Drilling Projects
Brian C. Dorwart¸ PE¸ PG Brierley Associates B-4-04 Monday, March 12 – PM Sessions 5:00 PM Line Q3 Pipeline – Slipline Rehabilitation
    F-6-04 Wednesday, March 14 – AM Sessions 9:15 AM Are You Receiving the CIPP Thickness You’re Paying For?
Jackson Dove Sammamish Plateau Water and Sewer District B-1-04 Monday, March 12 – PM Sessions 5:00 PM Challenging HDD Watermains Up Steep Slopes
Steve Dover City of Ottawa A-5-02 Monday, March 12 – AM Sessions 9:55 AM Condition Assessment and Management of Critical Watermains in the City of Ottawa
Bruce Downing¸ P.Eng. Golder Associates E-2-03 Tuesday, March 13 – PM Sessions 4:20 PM Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling
Edward Duggan Boston Water and Sewer Commission F-3-01 Wednesday, March 14 – AM Sessions 8:00 AM Old Pipe/Renewed Pipe – How New Technology Enhances the Rehabilitation of a 140-Year-Old Sewer
Russell Eberwein Harris & Associates Mr. Eberwein is a Senior Project Manager with Harris & Associates. His specialty is the design of underground utility systems such as water¸ sanitary sewer and storm drainage. He has extensive experience with trenchless installation and rehabilitation methods. B-4-03 Monday, March 12 – PM Sessions 4:35 PM Cranking up the Delivery – City of Richmond 2011 Sanitary Sewer Lining Project
Mo Ehsani¸ Ph.D.¸ P.E.¸ President¸ PipeMedic¸ LLC E-1-01 Tuesday, March 13 – PM Sessions 3:30 PM Winter Wonderland does Wonders to CIPP Renewal of a High Pressure Gas Main in New Jersey
Csaba Ekes SewerVUE Technology Corp. Csaba Akes is the founder and president of SewerVUE¸ a company specializing in developing and licensing cutting edge pipe inspection technologies. Dr Akes has authored over 100 consulting reports and technical papers and is an internationally recognized expert on the applications of GPR and PPR. D-5-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Combined Application of Pipe Penetrating Radar and LIDAR for Large Diameter Pipe Inspection
Kenneth Eyre¸ PE¸ PACP Greeley and Hansen E-5-02 Tuesday, March 13 – PM Sessions 3:55 PM Large Diameter Force Main Investigations – Two Level Approach
Angelo Fabiano NYSEARCH F-4-03 Wednesday, March 14 – AM Sessions 8:50 AM Development of a Carbon Calculator Tool to Compare Trenchless and Standard Pipeline Activities
C. Timothy Fallara City of Columbus¸ DOSD Tim has over 30 yrs experience in planning¸ design and construction of sewers and treatment plants. He has worked in construction and eng. consulting and now has been with the City of Columbus over 20 years helping to manage the design and construction of collection systems and treatment plants. C-5-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Separating the Forest from the Trees – The Use of GIS Decision Tool to Make Intelligent Asset Decisions
      D-5-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM If Finding and Removing I/I Were Easy
Siri Fernando City of Edmonton¸ Drainage Services Siri Fernando is the Engineering Manager of Design and Construction¸ Drainage Services with the City of Edmonton. Siri holds a B. Sc degree in Civil Engineering from The University of Ceylon¸ Sri Lanka and a M. Eng. degree in Construction Engineering and Management from the University of Alberta. A-3-01 Monday, March 12 – AM Sessions 9:30 AM Just in Time Rehabilitation of Twin Steel Sewer Siphon
      A-3-04 Monday, March 12 – AM Sessions 10:45 AM Innovative CIPP Relining Methods Reduce Open-cut Spot Repairs in Edmonton
      D-2-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pilot Tube Microtunneling in City of Edmonton – Challenges and Successes
    D-3-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Lining of a 2.4-m ID Inverted Syphon Tunnel for Zero Leakage
Roger Ficko IVIS Inc. Roger Ficko¸ P.Eng.¸ CRSP¸ is the Operation Manager and Director of Safety with IVIS Inc. of Edmonton¸ Alberta and has filled this role since he began his work with IVIS in March¸ 2009. Roger has a BSc. in Civil Engineering from the University of Alberrta and 25 years of experience in the underground A-3-04 Monday, March 12 – AM Sessions 10:45 AM Innovative CIPP Relining Methods Reduce Open-cut Spot Repairs in Edmonton
James Finnigan¸ P.E. PB Americas¸ Inc. E-2-04 Tuesday, March 13 – PM Sessions 4:45 PM Tunneling Under the Overland Park Arboretum
Paul Fisk NDT Corporation A-5-03 Monday, March 12 – AM Sessions 10:20 AM Lesson Learned About External Corrosion That Lead to an Outfall Sewer Collapse
Greg Fisk Washington Suburban Sanitary Commission D-5-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Implementing Inertial Navigation Technologies
Mike Fleury Carollo Engineers Mike has 39 years of experience in condition assessment¸ pipeline design¸ trenchless rehabilitation and value engineering. C-5-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Risk-based Condition Assessment of Aqueduct Pipelines Using Multiple Inspection Technologies
Mathew Francis¸ PE URS Corporation Mr Francis has 18yrs experience in geotechnical and trenchless infrastructure design and construction¸ with expertise in HDD¸ ground treatments¸ geohazards and risk evaluations. He is currently chair of the ASCE Committee on Critical Infrastructure developing resilience tools and hazard mitigations. C-4-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Estimating Hammer Stresses for Pipe Ramming and HDD Assists
Randolph D. Fries¸ P.E. Montgomery County Environmental Services E-1-05 Tuesday, March 13 – PM Sessions 5:10 PM A Hydraulically Limited Interceptor 30-ft. Deep Under I-5
Mark Gahry Bidigare Contractors Inc. D-4-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Pipe Bursting and Pre-Chlorination: Cost Effectiveness on Large Scale Projects
Steven Gallyer Pacific Boring B-2-01 Monday, March 12 – PM Sessions 3:45 PM Guided Boring and the Lafayette/Pleasant Hill Road Trunk Sewer
Chris Garrett PICA Corp. USA Chris Garrett is the General Manager for PICA’s USA operations. He is trained as a field technician and data analyst. Currently¸ he looks after business development in the U.S. market. A-6-05 Monday, March 12 – AM Sessions 11:10 AM NDE Techniques for Water and Wastewater Pipe Condition Assessment
Maria Gierczak Kielce University of Technology D-3-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Buckling of Plastic Pipes and Pipeline Rehabilitation Liners on Chosen Examples
Michael Gipsov¸ PE Washington Suburban Sanitary Commission Mr. Michael Gipsov¸ PE¸ Principal Structural Engineer of Washington Suburban Sanitary Commission (WSSC). He is in charge of the large diameter PCCP rehabilitation E-3-04 Tuesday, March 13 – PM Sessions 4:45 PM QA/QC Procedures for Structural Rehabilitation of PCCP with CFRP Composites
Prof. Dr. Ulrich Glombitza OSSCAD GmbH & Co. KG He received the Dr.-Ing. degree in electrical engineering in 1993 From 1994-2005 he worked as R&D manager in a leading world wide operating company in the field of optical fiber & optical sensor technology. In 2007 he established OSSCAD with development & sales of Raman temperature sensor technology. C-6-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Fiberoptic Cure Verification (FCV) Ensures Quality, Longevity of CIPP Liner Installations
Jennifer Glynn¸ P.E. RMC Water and Environment B-4-02 Monday, March 12 – PM Sessions 4:10 PM High Temperature Aeration Piping – How Can I Rehabilitate It?
Shrirang Golhar Espey Consultants C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
Don Gonzales Northwest Boring C-2-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Microtunneling through Abrasive Soil with Hard Cobbles and Boulders – Construction of the Santa Ana River Interceptor (SARI) Replacement
Ben Goodall Inland Pipe Rehab IPR provides a comprehensive portfolio of trenchless rehabilitation services and technologies to repair and maintain critical water¸ wastewater and industrial pipe infrastructure nationally. D-4-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Large Diameter Pipe Bursting Case Study – City of Dallas¸ Texas
Alan Goodman HammerHead Trenchless Equipment Alan Goodman has more than ten years of experience in underground and trenchless construction. He works with municipalities¸ engineering firms¸ and contractors providing training¸ tech support and pre-project planning installations for ramming¸ bursting and other trenchless projects. D-4-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Pipe Bursting and Pre-Chlorination: Cost Effectiveness on Large Scale Projects
Walter Graf Water Environment Research Foundation C-6-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Interactive Web Portal for Supporting Decision Making Related to Technical¸ Financial and Legal Issues
Jeffrey Graham Hydromax USA E-4-03 Tuesday, March 13 – PM Sessions 4:20 PM Creating High Confidence – Essential Elements for Cross Bore Elimination Projects
Jeffrey Griffiths Hydromax USA Jeff brings over 15 years of experience in engineering¸ marketing and business development¸ primarily in water-related services within multiple industries. He holds a BS in Mechanical Engineering from Virginia Tech and an MBA from The College of William and Mary. B-5-04 Monday, March 12 – PM Sessions 5:00 PM Are Sewer Lateral Inspections Cost-effective?
Ahmad Habibian, Ph.D., P.E. Black & Veatch Corporation D-4-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pipe Bursting and Sliplining Reach New Levels of Production in the City of Oxnard¸ California, Through New Innovative Design, Planning, Equipment and Construction Methods
Steve Hallock City of St. Pete Beach¸ FL E-5-01 Tuesday, March 13 – PM Sessions 3:30 PM Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study
Dan Hammer Mukilteo Water and Wastewater District A-1-01 Monday, March 12 – AM Sessions 9:30 AM Directional Drilling in Mukilteo – Lessons Learned from an HDD with 330-ft. of Elevation Difference
Richard Hanford¸ GE SHN Consulting Engineers & Geologists¸ Inc. Mr. Hanford is a registered civil and geotechnical engineer who has been practicing throughout the United States for the past 30+ years. C-1-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Risk Mitigation Strategies for Directional Drilling Projects
Keith Hanks City of Los Angeles Assistant Division Engineer¸ Wastewater Conveyance Engineering Division. D-3-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM 1 Million ft. of Trenchless in Los Angeles
Jamie Hannam Halifax Water F-6-01 Wednesday, March 14 – AM Sessions 8:00 AM Northwest Arm Trunk Sewer Rehabilitation – Case Study
Adrian Hansen Golder Associates C-1-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Vancouver City Central Transmission Project – Horizontal Directional Drilling and Supply and Installation of High Density Polyethylene Duct
Jim Hansen¸ P.E. Brown and Caldwell Jim Hansen has over 27 years of engineering experience in the planning¸ design¸ operations and maintenance (O&M)¸ and general management of municipal sanitary and stormwater infrastructure facilities and programs. He himself is a "Beaver"¸ being a graduate of Oregon State University. F-6-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Rehab of Sewers in the Beaver State – Design¸ Construction and Lessons Learned
Paul Hanson Ductile Iron Pipe Research Association DIPRA A-1-05 Monday, March 12 – AM Sessions 11:10 AM Pittsfield Township Watermain Rehabilitation and Replacement Case Study
Glenn Harrah Terracon¸ Inc. F-2-04 Wednesday, March 14 – AM Sessions 9:15 AM Dugway East Interceptor Relief Sewer Hand Tunnel Crossing Installation
Mark Havekost Jacobs Associates C-2-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Microtunneling through Abrasive Soil with Hard Cobbles and Boulders – Construction of the Santa Ana River Interceptor (SARI) Replacement
Clay Haynes Black & Veatch Corporation Mr. Haynes is a professional engineer at Black and Veatch with over 20 years of planning¸ design¸ inspection¸ and construction management experience for tunneling projects. E-2-01 Tuesday, March 13 – PM Sessions 3:30 PM Tapping the Mighty Missouri Using Trenchless Methods
Paul Headland Black & Veatch Corporation Mr. Headland is a Tunnel Practice Section Leader at the Black & Veatch.. His area of expertise is engineering geology including rock and soil mechanics¸ geology¸ and general geotechnical engineering. He has experience in all types of large and small diameter tunnel construction including trenchless C-2-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM City of East Chicago Raw Water Pipeline – Microtunneling in Clean Sands Beneath the Water Table
    E-4-05 Tuesday, March 13 – PM Sessions 5:10 PM Paying Small Trenchless Projects Their Dues – A Discussion on Risk Reduction Strategies for Small Trenchless Projects
Arne Hedeen Hedeen & Caditz¸ PLLC Arne Hedeen is a member with the law firm of Hedeen & Caditz¸ PLLC. His practice focuses on construction and government contract law and general civil litigation. E-4-04 Tuesday, March 13 – PM Sessions 4:45 PM Construction Failure Case Study: Trenchless Sewer Line Replacement Project Grade Failure
Jeffrey C. Heden¸ PE J. C. Heden and Assocaites¸ Inc. Mr. Heden is the president and founder of J. C. Heden and Associates¸ a San Diego-based engineering design firm specializing in water and wastewater conveyance projects. He focuses on pipeline and pump station design. Mr. Heden attended the Univ.of Utah and Colorado State Univ. and is a Calif PE. B-4-04 Monday, March 12 – PM Sessions 5:00 PM Line Q3 Pipeline – Slipline Rehabilitation
Thomas Hennings Jacobs Associates Associate with Jacobs Associates since 2007 and Structural Engineer with more than 20 years of experience; received his BSCE from Rutgers University School of Engineering in 1989¸ and MSCE from Purdue University College of Engineering in 1990; he is currently licensed in 12 States E-5-05 Tuesday, March 13 – PM Sessions 5:10 PM Condition Assessment of Conveyance Tunnels – Effective Approaches to Managing Reliability
Terry Henry Insituform Technologies¸ Inc. Terry Henry¸ Business Development Manager¸ has been with Insituform for 12 years helping communities rehabilitate their underground infrastructure. B-3-03 Monday, March 12 – PM Sessions 4:35 PM Malibu Force Main Rehabilitation
Thomas Hessler¸ P.E.¸ P.S. DLZ Ohio¸ Inc. Mr. Hessler has over 21 years of experience in public works engineering and construction administration of major sanitary sewer projects. Mr. Hessler served as the Design Project Manager & Field Representative for DLZ Ohio¸ Inc. on the Dugway East Interceptor Relief Sewer Project. F-2-04 Wednesday, March 14 – AM Sessions 9:15 AM Dugway East Interceptor Relief Sewer Hand Tunnel Crossing Installation
Dave Hofer New Castle County B-4-01 Monday, March 12 – PM Sessions 3:45 PM Lateral Rehabilitation Options and Their Cost-benefit comparison – One Utility’s Perspective
Dave Holcomb TT Technologies¸ Inc. We are a Jack & Bore/Directional Drilling and Tunneling business¸ servicing pipe and cable laying¸ and complex deep excavation contracts for the Telephone¸ Hydro¸ Water¸ Gas¸ Oil and Sanitation Sewage utilities. We are specialists in exacting line and grade bores. C-4-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Failing 96-in. Diameter CMP Replaced Utilizing Pipe Ramming Technology
      D-4-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Large Diameter Pipe Bursting Case Study – City of Dallas¸ Texas
Ryan Hook Carollo Engineers D-1-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Garrity Creek Emergency Construction Using HDD
Neil A. Hoult Queen’s University A-4-03 Monday, March 12 – AM Sessions 10:20 AM Assessment of Corroded Corrugated Steel Culverts Using Field Data
Alan Howard Brierley Associates¸ LLC C-2-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Unconventional Subsurface Investigation Methods for Tunnel/Trenchless Projects
Mike Hoye Michels Directional Crossings C-1-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Vancouver City Central Transmission Project – Horizontal Directional Drilling and Supply and Installation of High Density Polyethylene Duct
Andreas Huettemann Karl Weiss Technologies GmbH Director of R&D and Quality at Karl Weiss Technologies GmbH of Berlin¸ Germany. Chairman of task group for technical rules of trenchless technology in Germany. Vice President of starline Trenchless Technology¸ LLC of Chicago¸ IL¸ involved in projects for NYGAS and GTI for development of CIP-lining. F-6-03 Wednesday, March 14 – AM Sessions 8:50 AM Rollercoaster in the Underground – Rehabilitation of 30-in. and 40-in. Sewer Pressure Pipelines Poses Special Challenges
Abhinav Huli Haley& Aldrich C-1-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Accuracy and Predictability of Design Parameters in Horizontal Directional Drilling
Steve Hunt CH2M HILL A-2-05 Monday, March 12 – AM Sessions 11:10 AM Means and Methods of Construction – Whose Domain is it?
Wayne Hunter Espey Consultants C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
Paul D. Huston¸ PACP Greeley and Hansen E-5-02 Tuesday, March 13 – PM Sessions 3:55 PM Large Diameter Force Main Investigations – Two Level Approach
Ray Hutchinson MWH Ray Hutchinson has over 44 years related experience with Engineering Consultants and Local/Central Government. This has included planning¸ design¸ and supervision of construction and project management of storm drainage¸ wastewater collection¸ including rehab¸ and wastewater treatment projects C-3-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Sewer Rehabilitation in the City of Atlanta – Past¸ Present and Future
Ashikul Islam Trenchless Technology Center (TTC)¸ Louisiana Tech C-6-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Interactive Web Portal for Supporting Decision Making Related to Technical¸ Financial and Legal Issues
Robert Item City of Palo Alto Robert Item has a BSAE from Cal Poly State University¸ San Luis Obispo¸ CA. Robert works for the City of Palo Alto in the Utilities Department. Robert is currently responsible for the implementation of the City’s cross bore investigation program. A-4-05 Monday, March 12 – AM Sessions 11:10 AM Investigating Cross Bores in the Wastewater Collection System
Robert Jacobsen¸ P.E. Brown and Caldwell Bob Jacobsen is a project engineer for Brown and Caldwell with 10 years of experience in water/wastewater treatment and conveyance-related projects. He received his undergraduate degree from Virginia Tech and his master’s degree from Johns Hopkins University¸ both in civil engineering. F-5-02 Wednesday, March 14 – AM Sessions 8:25 AM Flood Grouting Sanitary Sewers for Infiltration Control
Roland Johnson¸ CEG SHN Consulting Engineers & Geologists¸ Inc. C-1-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Risk Mitigation Strategies for Directional Drilling Projects
Cliff Jones Wachs Water Services   A-5-04 Monday, March 12 – AM Sessions 10:45 AM Advances in Water Pipeline Condition Assessment
Ian Jonkers PipeWorks¸ Ltd. C-1-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM The Birkdale ‘B’ Project: 3,420 lf of At-grade HDD in New Zealand
Jim Kabat Michels Tunneling C-2-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM City of East Chicago Raw Water Pipeline – Microtunneling in Clean Sands Beneath the Water Table
Dave Kaiser¸ P.E. Northshore Utility District A-2-04 Monday, March 12 – AM Sessions 10:45 AM Redesigning for Success – A Challenging Sewer Installation in Kirkland¸ Washington
Ed Kampbell Jason Consultants A technical consultant to the trenchless pipeline rehabilitation industry. Condition assessment of the existing host-pipe soil structure interaction system is a perquisite of this work and he has developed an expertise with existing and emerging condition assessment tools/technologies. C-5-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Using the State-of-the-art Pipeline Condition Assessment Tools to Proper Advantage
Robert P. Kelly City of Westlake¸ Ohio Mr. Kelly is the Director of Engineering for the City of Westlake for the past 12 years. He manages the engineering program which manages all engineering and construction projects in the City. They have been conducting I/I removal and are using the latest technologies. C-3-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Lessons Learned During Sewer Rehabilitation on Public and Private Property
Tim Kennedy STRUCTURAL F-4-01 Wednesday, March 14 – AM Sessions 8:00 AM Pipeline Repair Technologies, Current and Future
John Kennedy¸ P.E. Clean Water Services F-6-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Rehab of Sewers in the Beaver State – Design¸ Construction and Lessons Learned
Kristina Kiest LMK Technologies Kristina Kiest¸ Marketing Manager at LMK Technologies B-3-02 Monday, March 12 – PM Sessions 4:10 PM Hydrophilic Gasket Sealing Technology – A Solution to Deficiencies in Cured-in-place Pipe Lining
Richard Kirby Hillsborough County Public Utilities C-4-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Hillsborough County Florida Utilizes Varied Trenchless Methods with Success
Robert D. Klavoon, P.E., Wendel Mr. Klavoon’s primary focus is in the design and project management of large infrastructure improvement projects. He has worked extensively with the Niagara County Water District and municipalities in the WNY area on a variety of water distribution and wastewater collection projects. F-1-01 Wednesday, March 14 – AM Sessions 8:00 AM Water HDD Methodology Applied to New Waterline Under Historic Erie Canal
Fritz J. Klingler¸ P.E. NTH Consultants¸ Ltd. C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
Joel Komarek City of Lake Oswego Joel Komarek served as the Project Director for the Lake Oswego Interceptor Sewer Project. His prior experience includes serving as the City of Lake Oswego City Engineer and working at a private engineering firm. He earned a BS degree in Civil Engineering from Portland State University. A-4-01 Monday, March 12 – AM Sessions 9:30 AM An Innovative Alternative – Buoyant Interceptor in a Lake
John R. Kosnak¸ P.E. Senior Project Engineer C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
Harry Krinas City of Hamilton C-5-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Direct Benefits of Undertaking Multi-sensor Inspections for Large Diameter Sewers
Dave Krywiak Stantec Consulting Ltd. A-5-01 Monday, March 12 – AM Sessions 9:30 AM St. Albert CCTV Inspection and Sewer Rehabilitation Program
Dave Krywiak Stantec Consulting Ltd. Dave Krywiak is a professional engineer with 35 years experience in consulting. During his career he has been involved in over 40 projects with the trenchless components, including tunnels, microtunnels, HDD and CIPP projects. He is a strong supporter of NASTT at both the chapter and national levels. C-1-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM North LRT Expansion at MacEwan – 72 kV Cable Relocation Project
Andrew Kubek City of Virginia Beach E-5-03 Tuesday, March 13 – PM Sessions 4:20 PM Sustainable Infrastructure Planning For Long-term Wastewater Force Main Programs
Emilia Kuliczkowska Kielce University of Technology D-3-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Buckling of Plastic Pipes and Pipeline Rehabilitation Liners on Chosen Examples
Andrzej Kuliczkowski Kielce University of Technology A professor at Kielce University of Technology in Poland and a Chairman of Polish Foundation for Trenchless Technology since 2005. An author of 280 publications¸ including 10 books. A chairman of no – dig conferences organized in Poland. For 10 years up to now a chairman of a consulting company. D-3-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Buckling of Plastic Pipes and Pipeline Rehabilitation Liners on Chosen Examples
Jonathan Kunay CDM Mr. Jonathan Kunay has a bachelor’s degree from the University of Cincinnati. He is a registered Professional Engineer and is LEED AP Certified E-4-02 Tuesday, March 13 – PM Sessions 3:55 PM The Benefits of Post-construction Warranty Inspections for Long-term Sanitary Sewer Overflow Control Program Success
George E. Kurz¸ P.E.¸ DEE Barge Waggoner Sumner & Cannon For the past 25 years George has conducted rehabilitation for combined and separate sewers. He operated the Chattanooga CS system and designed improvements for the Nashville combined system. He received a B.S. in Civil Engineering from Tennessee Tech University¸ and is a member of WEF and ASCE. F-3-05 Wednesday, March 14 – AM Sessions 9:40 AM 96-in. Brick Nashville CSO Outfall Relined After Flood Damage
      F-5-01 Wednesday, March 14 – AM Sessions 8:00 AM Sewer Rehab Pays in Brentwood Tennessee
Mark Kwilinski JRGO¸ LLC Mr. Kwilinski is a professional engineer with extensive industry experience in pipeline infrastructure projects¸ particularly trenchless construction methods. C-4-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Case Studies in Regulatory¸ Legal and Design Issues in Pipe Bursting
Brian Lakin South Central Connecticut Regional Water Authority E-5-05 Tuesday, March 13 – PM Sessions 5:10 PM Condition Assessment of Conveyance Tunnels – Effective Approaches to Managing Reliability
Robert Lanzafame GeoEngineers Robert Lanzafame is a Staff Engineer at GeoEngineers Walnut Creek¸ California office. Robert has a B.S. in Civil Engineering from U.C. Berkeley and is currently working on an M.S. in Geotechnical Engineering at U.C. Berkeley. B-2-01 Monday, March 12 – PM Sessions 3:45 PM Guided Boring and the Lafayette/Pleasant Hill Road Trunk Sewer
Duane Larson¸ P.E. Encina Wastewater Authority B-4-02 Monday, March 12 – PM Sessions 4:10 PM High Temperature Aeration Piping – How Can I Rehabilitate It?
Robert Lee¸ P.E. Brown and Caldwell   A-3-03 Monday, March 12 – AM Sessions 10:20 AM CIPP for Structural Rehabilitation
    F-6-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Rehab of Sewers in the Beaver State – Design¸ Construction and Lessons Learned
Brian T. Lee¸ PE Rainbow Municipal Water District B-4-04 Monday, March 12 – PM Sessions 5:00 PM Line Q3 Pipeline – Slipline Rehabilitation
Rod Lee Pipetel Technologies Inc. Rod Lee is General Manager of Pipetel Technologies. He previously held positions at InvoDane Engineering developing inspection tools for unpiggable pipelines since 2003. He holds a BS in Mechanical Engineering from Queen’s University¸ a MS in the same discipline from UC Berkeley¸ and a MBA from Duke B-5-02 Monday, March 12 – PM Sessions 4:10 PM Robotic Inline Inspection of Unpiggable Natural Gas Pipeline with Explorer
Marc A. Lehmann¸ P.E. CDM Mr. Lehmann is a professional engineer in CDM’s Columbus Ohio office. Marc is PACP¸ MACP¸ and LACP certified¸ and has worked in the industry for almost 10 years focusing on collection system and inflow and infiltration studies. C-5-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Separating the Forest from the Trees – The Use of GIS Decision Tool to Make Intelligent Asset Decisions
Pierre Levesque Solutions Modex Mr. Levesque holds a bachelor’s degree in Computer Science (1986) and a MBA in Finance (1993). He is a CFA Charterholder (Chartered Financial Analyst) since 1998. He has worked for 25 years in the fiels of IT and finance. He was employed by Caisse de depot et placement du Quebec for 10 years. A-5-05 Monday, March 12 – AM Sessions 11:10 AM Applying Risk Management and Financial Analysis to Asset Management Planning
Joseph Loiacono Sanexen Environmental Services E-3-01 Tuesday, March 13 – PM Sessions 3:30 PM Trenchless Renewal of Watermains Beneficial to Both the Existing Watermain and the Asphalt Pavement
Jason S. Lueke Arizona State University Jason Lueke is an Assistant Professor at Arizona State University¸ member of the NASTT Board of Directors¸ and Chair of the WESTT Chapter. His research focus is underground infrastructure and trenchless construction methods. He was the inaugural recipient of the NASTT Trent Ralston Award in 2010. F-1-03 Wednesday, March 14 – AM Sessions 8:50 AM Comparison of Buried Pipe Behavior – Open-cut vs. Directional Drilling
      F-2-05 Wednesday, March 14 – AM Sessions 9:40 AM Instrumentation and Monitoring of Pilot Tube Microtunneling Installations
Karl Lux Village of Springville, Dept. of Public Works   F-1-02 Wednesday, March 14 – AM Sessions 8:25 AM Triple Barrell Siphon Installed in Tight Quarters
Tracy J. Lyman Brierley Associates¸ LLC Mr. Lyman is a Senior Consultant for Lyman Henn¸ a division of Brierley Associates¸ LLC. He holds a Master of Engineering degree from the Colorado School of Mines and has over 35 years of experience in geology¸ geotechnical engineering and tunnel engineering for heavy civil infrastructure projects. C-2-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Unconventional Subsurface Investigation Methods for Tunnel/Trenchless Projects
Craig Lyon Pittsfield Charter Township A-1-05 Monday, March 12 – AM Sessions 11:10 AM Pittsfield Township Watermain Rehabilitation and Replacement Case Study
Edmund Lyons Mladen Buntich Construction Co.¸ Inc. Edmund Lyons has been an engineer for Mladen Buntich Construction Co.¸ Inc. for over six years¸ specializing in heavy underground construction. He received his BS in Civil Engineering from Syracuse University in 2002¸ and began his career with LA County Department of Public Works. B-3-03 Monday, March 12 – PM Sessions 4:35 PM Malibu Force Main Rehabilitation
Chris Macey, P.Eng. AECOM Chris Macey, P. Eng. is the North American Practice Leader for AECOM in North America for Condition Assessment and Rehabilitation of Underground Infrastructure. With over 30 years of experience Chris has considerable expertise in material failure assessment for pipelines in both gravity and pressure service. He has extensive knowledge of pipeline materials, pipe/soil interaction, pipeline deterioration processes, and material limit states. Chris graduated from University of Manitoba in 1977 and has been working with AECOM since 1978. A-3-05 Monday, March 12 – AM Sessions 11:10 AM 34 Years of Quality Assurance Testing for CIPP in Winnipeg, Manitoba
Van Thien Mai Queen’s University Graduate student¸ Department of Civil Engineering¸ studying deteriorated metal culverts using thickness measurements and large scale laboratory testing; he received his BEng from Ryerson University in Toronto A-4-03 Monday, March 12 – AM Sessions 10:20 AM Assessment of Corroded Corrugated Steel Culverts Using Field Data
Arbind Mainali Design & Construction¸ City of Edmonton D-3-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Lining of a 2.4-m ID Inverted Syphon Tunnel for Zero Leakage
George C. Mallakis TT Technologies¸ Inc. D-4-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pipe Bursting and Sliplining Reach New Levels of Production in the City of Oxnard¸ California, Through New Innovative Design, Planning, Equipment and Construction Methods
Charles Manning Espey Consultants C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
Fern Marcuccio City of Ottawa A-5-02 Monday, March 12 – AM Sessions 9:55 AM Condition Assessment and Management of Critical Watermains in the City of Ottawa
Bradley Marin Conestoga-Rovers & Associates Glenn is a Principal Project Manager for Hatch Mott MacDonald. Glenn obtained his bachelors¸ masters and doctorate degrees from the University of Waterloo and is a registered professional engineer in the States of Washington¸ Oregon¸ Kentucky and Ohio and the Provinces of Ontario and Alberta. B-1-03 Monday, March 12 – PM Sessions 4:35 PM Practical Applications of Hydraulic Fracturing Evaluation in HDD Design
John Marshall J.W. Marshall & Associates Inc. Mr. John Marshall has over thirty years of experience in of all aspects of pipeline infrastructure investigation¸ analysis¸ management and design. Mr. Marshall established J.W. Marshall Associates Inc. in 1999. The company specializes in pipeline condition analysis and investigation A-5-03 Monday, March 12 – AM Sessions 10:20 AM Lesson Learned About External Corrosion That Lead to an Outfall Sewer Collapse
Jeff Martin Henniker Directional Drilling A-1-02 Monday, March 12 – AM Sessions 9:55 AM Franklin Falls – The Toughest Trenchless Crossing in New Hampshire
David Mathy GeoEngineers Dave Mathy is Principal Engineer at GeoEngineers Walnut Creek¸ California office. Dave has a B.S. in Civil Engineering from Cal Poly¸ Pomona and an M.S. in Geotechnical Engineering from U.C. Berkeley and is a registered Civil and Geotechnical Engineer in the state of California. B-2-01 Monday, March 12 – PM Sessions 3:45 PM Guided Boring and the Lafayette/Pleasant Hill Road Trunk Sewer
John Matthews Battelle Memorial Institute John is a Research Scientist at the Battelle Memorial Institute based in Columbus¸ OH in their Environmental Restoration and Infrastructure group¸ which supports clients in evaluating and implementing technologies for water and wastewater treatment and infrastructure rehabilitation. A-4-02 Monday, March 12 – AM Sessions 9:55 AM Review of QA/QC Procedures Associated with Rehabilitation of Large Diameter Interceptors
    C-3-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Rehab of a Stormwater Culvert Through Contaminated Soil and Groundwater
      F-4-02 Wednesday, March 14 – AM Sessions 8:25 AM Evaluation of the Carbon Footprint of Innovative Watermain Rehabilitation Technologies vs. Open-cut
Greg McCorkhill GHD Consulting Engineers¸ LLC   F-1-02 Wednesday, March 14 – AM Sessions 8:25 AM Triple Barrell Siphon Installed in Tight Quarters
Don McCullers Cardno TBE E-5-01 Tuesday, March 13 – PM Sessions 3:30 PM Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study
Shelley McDonald City of Ottawa A-5-02 Monday, March 12 – AM Sessions 9:55 AM Condition Assessment and Management of Critical Watermains in the City of Ottawa
James McKelvey Black & Veatch Corporation E-4-05 Tuesday, March 13 – PM Sessions 5:10 PM Paying Small Trenchless Projects Their Dues – A Discussion on Risk Reduction Strategies for Small Trenchless Projects
Adam McKnight Weber Basin Water Conservancy District C-5-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Risk-based Condition Assessment of Aqueduct Pipelines Using Multiple Inspection Technologies
Michael McMahon, P.E. Oakland County Water Resources Commissioners Office C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
Ashan McNealy Pure Technologies Ltd. Ashan McNealy is a Project Manager for Pure Technologies. After serving 5 years in the military as an engineer officer¸ Ashan joined Pure where he has spent the last 2 years doing inspection¸ monitoring and condition assessment of water and wastewater mains. D-5-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Implementing Inertial Navigation Technologies
Troy McNeil BSEI Municipal Engineers B-1-02 Monday, March 12 – PM Sessions 4:10 PM Planning, Extensive Monitoring and Good Communication Solves Public Noise Concerns on Two Large HDD Crossings in Sundre, Alberta
Colin Meldrum¸ P.Eng. Metro Vancouver Colin is a Senior Project Engineer¸ responsible for the planning¸ design and construction of large diameter sewers and watermains in Metro Vancouver. He has 20 years of engineering experience in municipal infrastructure. E-2-03 Tuesday, March 13 – PM Sessions 4:20 PM Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling
Margie Meredith Avanti International F-2-01 Wednesday, March 14 – AM Sessions 8:00 AM Sealing Annular Space and Lateral Connections with Chemical Grouts
Riazul Mia City of Laredo D-3-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM The installation of 42-in. Storm Sewer through Trenchless Technology in a Highly Urbanized Area for the City of Laredo. Why hand tunneling was the method of choice over the other trenchless methods evaluated?
Nick Michels Mears HDD D-1-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Constructing Twin 24-in. Force Mains in a Highly Sensitive Environment Utilizing HDD
John Milligan Vermeer D-2-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Unique Location and Ground Conditions Call for Innovative Approach to On-grade Boring
Chris Milton City of Brentwood F-5-01 Wednesday, March 14 – AM Sessions 8:00 AM Sewer Rehab Pays in Brentwood Tennessee
Dorian Modjeski¸ PE¸ BCEE Cardno TBE Dorian is Director of water & wastewater engineering services at Cardno TBE. He is a professional engineer registered in15 states. He is experienced in the applications of trenchless technology for pipe design and construction including condition assessment and rehab of utility infrastructures. E-5-01 Tuesday, March 13 – PM Sessions 3:30 PM Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study
Rod Moeller¸ P.E. CDM Mr. Moeller is a professional engineer with over 20 years of experience developing GIS-based procedures and tools for wastewater collection system investigations¸ master planning¸ modeling¸ capital improvements planning¸ and rehabilitation planning. C-5-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Separating the Forest from the Trees – The Use of GIS Decision Tool to Make Intelligent Asset Decisions
Richard Montemarano LightStream, L.P. B-3-04 Monday, March 12 – PM Sessions 5:00 PM Measuring Quality Assurance/ Quality Control
Gayle Moomaw¸ PACP DC Water/Greeley and Hansen Mr. Moomaw has over 34 years of experience in wastewater infrastructure management. Expertise includes sewer system investigations¸ developing remediation details¸ conveyance system and treatment plant operations and maintenance¸ sewer system rehabilitation designs and construction monitoring. E-5-02 Tuesday, March 13 – PM Sessions 3:55 PM Large Diameter Force Main Investigations – Two Level Approach
Ian D. Moore GeoEngineering Centre at Queen’s – RMC A-4-03 Monday, March 12 – AM Sessions 10:20 AM Assessment of Corroded Corrugated Steel Culverts Using Field Data
Bill Moore AOC¸ LLC BS in Chemistry and Chemical Engineering with a Masters in Engineering Management. 25 years of experience in resin development including 17 years working on resin and catalyst system development for a major Cured-In-Place-Pipe company. Member of NASTT and NASSCO’s CIPP committee. B-3-01 Monday, March 12 – PM Sessions 3:45 PM Non-styrene Options for Cured-in-Place Pipe
Wynn Morgan Missouri American Water E-2-01 Tuesday, March 13 – PM Sessions 3:30 PM Tapping the Mighty Missouri Using Trenchless Methods
Catherine Morley P.E. RJN Group Inc Ms. Morley has 30 years experience in the civil engineering field in the US and internationally¸ in the design and construction of sanitary sewer and water systems. Recently her focus has been on rehabilitation of existing systems with a particular emphasis on pipe bursting and directional drilling D-2-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Unique Location and Ground Conditions Call for Innovative Approach to On-grade Boring
Tennyson M. Muindi¸ P.E. Haley & Aldrich A-1-03 Monday, March 12 – AM Sessions 10:20 AM Installation of Three Parallel Electric Ductbanks beneath the Chelsea River Using Horizontal Directional Drilling in Boston/Chelsea¸ Massachusetts
Drew Muirhead Barge Waggoner Sumner & Cannon F-5-01 Wednesday, March 14 – AM Sessions 8:00 AM Sewer Rehab Pays in Brentwood Tennessee
Nicole Murphy¸ P.E. Kennedy/Jenks Consultants Nicole Murphy¸ P.E. is a project manager at Kennedy/Jenks Consultants where she provides project management¸ design and construction support services for water & wastewater pipeline projects. Nicole serves as design consultant project manager for City of San Diego USIU-Miramar Trunk Sewer project. A-2-03 Monday, March 12 – AM Sessions 10:20 AM Microtunneling Gives Way to Auger Boring on Challenging Drive
James P. Murphy Complete Crossings Inc. Jim has a master’s degree in geotechnical engineering. He is a consulting engineer and has over 35 years of engineering experience in Canada¸ the United States and South America. Jim is currently a senior pipeline engineer and trenchless specialist with Complete Crossings Inc. in Calgary¸ Alberta. B-1-02 Monday, March 12 – PM Sessions 4:10 PM Planning, Extensive Monitoring and Good Communication Solves Public Noise Concerns on Two Large HDD Crossings in Sundre, Alberta
Jim Murphy City of Treasure Island¸ FL E-5-01 Tuesday, March 13 – PM Sessions 3:30 PM Holistic Approach to Condition Assessment of Two Florida Coastal Communities Force Mains – A Case Study
Redgenald Musana¸ P.Eng. Metro Vancouver E-2-03 Tuesday, March 13 – PM Sessions 4:20 PM Jervis Forcemain Tunnel – A Case Study in Urban Tunnelling
Verya Nasri AECOM D-2-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Pilot Tube Microtunneling within Variable Ground Conditions in Cleveland, Ohio
Mike Near Liquiforce Services F-3-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Lateral Rehabilitation – Business as Unusual
Vanessa Nedrick¸ P.E.¸ MSEM Remington¸ Venick & Beach F-5-05 Wednesday, March 14 – AM Sessions 9:40 AM Ways of Reducing I&I During Hard Economic Times
Boriszlav Neducza SewerVUE Technology Corp. He received an MS in geophysics from University of Miskolc¸ Hungary in 1991. He joined Eatvas Lor¡nd Geophysical Institute¸ Hungary in 1991. He joined Terraprobe Corp.¸ Canada in 2009 and he has been working as chief developer at SewerVUE Tech. Corp. since 2010. His main activity is R&D in NDT. D-5-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Combined Application of Pipe Penetrating Radar and LIDAR for Large Diameter Pipe Inspection
Patty Nelson¸ P.E. City of Portland   A-3-03 Monday, March 12 – AM Sessions 10:20 AM CIPP for Structural Rehabilitation
    E-1-05 Tuesday, March 13 – PM Sessions 5:10 PM A Hydraulically Limited Interceptor 30-ft. Deep Under I-5
Don Del Nero CH2M HILL A-2-05 Monday, March 12 – AM Sessions 11:10 AM Means and Methods of Construction – Whose Domain is it?
Stephen O’Connell Black & Veatch Corporation Mr. O’Connell is an engineering geologist for the Tunneling Group at Black & Veatch and his experience includes subsurface investigations¸ design¸ and construction management services for tunneling and trenchless construction projects throughout the country. C-2-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM City of East Chicago Raw Water Pipeline – Microtunneling in Clean Sands Beneath the Water Table
      E-4-05 Tuesday, March 13 – PM Sessions 5:10 PM Paying Small Trenchless Projects Their Dues – A Discussion on Risk Reduction Strategies for Small Trenchless Projects
Henry Oheim NSTAR Corporation A-1-03 Monday, March 12 – AM Sessions 10:20 AM Installation of Three Parallel Electric Ductbanks beneath the Chelsea River Using Horizontal Directional Drilling in Boston/Chelsea¸ Massachusetts
Kevin O’Keefe Fer-Pal Ltd Kevin has spent 25 years in the automotive industry in managing positions of Operations & quality. He was a quality engineer and a Six sigma Black Belt. He has spent much of his carrier involved with the Continuous Improvent programs (ISO 9000¸ six sigma). F-6-05 Wednesday, March 14 – AM Sessions 9:40 AM Quality Assurance and CIPP Lining
Mel Olson Southeast Directional Drilling C-4-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Conductor Barrel Installation Makes Boston’s Logan Airport HDD Project a Success
Matthew Olson Bore Master Inc. Matthew Olson is a Masters student in the School of Sustainable Engineering and the Built Environment at Arizona State University¸ and worked as a laborer/top man for Bore Master Inc. during the collection of data utilized in this research. F-2-05 Wednesday, March 14 – AM Sessions 9:40 AM Instrumentation and Monitoring of Pilot Tube Microtunneling Installations
Mary Cate Opila University of Delaware This paper was developed as part of Mary Cate Opila’s PhD dissertation at the University of Delaware under the guidance of Professor Nii Attoh-Okine. F-4-05 Wednesday, March 14 – AM Sessions 9:40 AM A New Approach in Pipe Structural Condition Scoring
Peter Oram AECOM E-5-03 Tuesday, March 13 – PM Sessions 4:20 PM Sustainable Infrastructure Planning For Long-term Wastewater Force Main Programs
Collins Orton TT Technologies¸ Inc. Southeast Directional Drilling is a leading horizontal directional drilling company with many years of experience handling the most challenging projects all over the world. No drilling company has the experience¸ professionalism¸ or impressive history that distinguishes S.E. Directional Drilling. C-4-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Conductor Barrel Installation Makes Boston’s Logan Airport HDD Project a Success
Manley Osbak The Crossing Company Manley Osbak is Vice President¸ Engineering & Estimating for The Crossing Company Incorporated. He entered the HDD industry in 1996 as a directional driller¸ and joined The Crossing Company in 1997. He has served as technical lead for the company since 2000. A-1-04 Monday, March 12 – AM Sessions 10:45 AM Improving the Standard of Mud Management
      E-4-01 Tuesday, March 13 – PM Sessions 3:30 PM Investigation of Horizontal Directional Drilling Construction Risks
David O’Sullivan PW Trenchless Construction Inc. C-6-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Carbon Reduction and the Trenchless Industry
Christa Overby City of Portland Bureau of Environmental Services C-2-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Microtunneling through Abrasive Soil with Hard Cobbles and Boulders – Construction of the Santa Ana River Interceptor (SARI) Replacement
Pete Oveson Brown and Caldwell Pete Oveson was a member of the engineering team and acted as the lead engineer during the construction phase of the project. His experience includes engineering and construction of water and wastewater projects. He earned BS and MS degrees in Civil Engineering from Utah State University. A-4-01 Monday, March 12 – AM Sessions 9:30 AM An Innovative Alternative – Buoyant Interceptor in a Lake
Brian Page Northeast Ohio Regional Sewer District D-2-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Pilot Tube Microtunneling within Variable Ground Conditions in Cleveland, Ohio
    F-2-04 Wednesday, March 14 – AM Sessions 9:15 AM Dugway East Interceptor Relief Sewer Hand Tunnel Crossing Installation
Jonathan Pearce City of Waterloo Jonathan has been with the City of Waterloo for 26 years¸ working as an inspector and special projects manager. He primarily works on trenchless projects and also serves on the Board of Directors of CATT at the University of Waterloo. F-3-02 Wednesday, March 14 – AM Sessions 8:25 AM CIPP Lateral Rehabilitation – Business as Unusual
Matt Pease Staheli Trenchless Consultants Matthew Pease¸ PE¸ is a Principal Engineer with STC who specializes in design and construction management of projects with trenchless components. A-1-01 Monday, March 12 – AM Sessions 9:30 AM Directional Drilling in Mukilteo – Lessons Learned from an HDD with 330-ft. of Elevation Difference
      A-2-04 Monday, March 12 – AM Sessions 10:45 AM Redesigning for Success – A Challenging Sewer Installation in Kirkland¸ Washington
    D-1-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Tulalip Tribe and City of Everett Bring Regional Water to the Pacific Northwest with Massive HDD Project
George Pendleton Kleinfelder/ SEA Consultants B-5-04 Monday, March 12 – PM Sessions 5:00 PM Are Sewer Lateral Inspections Cost-effective?
Todd Perimon Carollo Engineers Todd Perimon is a project manager and civil engineer in Carollo Engineer’s Portland office. Over his 19 year career he has worked extensively in water and wastewater treatment and infrastructure. D-1-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Constructing Twin 24-in. Force Mains in a Highly Sensitive Environment Utilizing HDD
Todd Perimon AECOM D-1-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Constructing Twin 24-in. Force Mains in a Highly Sensitive Environment Utilizing HDD
James Pistilli, P.E. Macomb County Publics Works Commissioners Office C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
Frank Policicchio Design & Construction¸ City of Edmonton D-3-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Lining of a 2.4-m ID Inverted Syphon Tunnel for Zero Leakage
Anna polito City of Dollard-Des-Ormeaux E-3-01 Tuesday, March 13 – PM Sessions 3:30 PM Trenchless Renewal of Watermains Beneficial to Both the Existing Watermain and the Asphalt Pavement
Steve Pollack Huxted Tunneling C-2-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Chemical Grout – The Settlement Solution for Microtunneling
Thomas Porzio MWH Americas Over 24 years design¸ operations and construction management experience focused primarily on CIPP rehab projects. The majority of this career was as a contractor¸ with the last 5 years as a consultant. Registered Engineer in Virginia and Maryland F-6-04 Wednesday, March 14 – AM Sessions 9:15 AM Are You Receiving the CIPP Thickness You’re Paying For?
Christopher Price Staheli Trenchless Consultants Christopher Price is a civil engineer with Staheli Trenchless Consultants. His focus is in HDD design and specialty construction inspection. A-2-01 Monday, March 12 – AM Sessions 9:30 AM Challenges and Success of Open Shield Pipe Jacking Construction in a Congested Neighborhood
Harry R. Price¸ P.E. NTH Consultants¸ Ltd. C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
Tom Pullen Brierley Associates¸ LLC Tom is a trenchless engineer with Brierley Associates¸ and specializes in the design and construction management of horizontal directional drilling projects A-1-02 Monday, March 12 – AM Sessions 9:55 AM Franklin Falls – The Toughest Trenchless Crossing in New Hampshire
Jon Putnam GHD Consulting Engineers¸ LLC Mr. Putnam has 14 years experience in civil engineering including evaluation¸ engineering¸ and construction of water and sanitary systems; underground utility assessment and rehabilitation; various trenchless technologies; hydraulic modeling¸ construction engineering¸ and is NASSCO PACP Certified. F-5-04 Wednesday, March 14 – AM Sessions 9:15 AM Effective Inflow/Infiltration Reduction Utilizing Cured-In-place Pipe Lining
Ashley Quinn W.L. Hailey E-2-01 Tuesday, March 13 – PM Sessions 3:30 PM Tapping the Mighty Missouri Using Trenchless Methods
George Ragula Distribution Technology Manager¸ Public Service El E-1-01 Tuesday, March 13 – PM Sessions 3:30 PM Winter Wonderland does Wonders to CIPP Renewal of a High Pressure Gas Main in New Jersey
Saeed Rahjoo University of Texas at Arlington I am second year PhD student at civil engineering¸ Construction Management Department¸ University of Texas at Arlington. I have 10 years experience in designing different kinds of building and underground infrastructures. C-6-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Trenchless Technology Applications for Culvert Installations
Michelle Ramos GeoEngineers Inc Michelle Ramos has 14 years of experience in geotechnical engineering¸ trenchless engineering¸ site investigation¸ project management and construction monitoring and inspection. B-1-04 Monday, March 12 – PM Sessions 5:00 PM Challenging HDD Watermains Up Steep Slopes
Brad Ream Midwest Mole¸ Inc. Brad is the Project Engineer on this project and has overseen the project from the very beginning. Brad has been an integral part of the success of this project. B-2-04 Monday, March 12 – PM Sessions 5:00 PM Shively Interceptor
Phil Regen¸ P.E. Nashville Metro Water Services F-3-05 Wednesday, March 14 – AM Sessions 9:40 AM 96-in. Brick Nashville CSO Outfall Relined After Flood Damage
Greg Rice Halifax Water F-6-01 Wednesday, March 14 – AM Sessions 8:00 AM Northwest Arm Trunk Sewer Rehabilitation – Case Study
Dan Rites City of St. Albert A-5-01 Monday, March 12 – AM Sessions 9:30 AM St. Albert CCTV Inspection and Sewer Rehabilitation Program
Jim Robinson Jim Robinson Contracting For over 45 years TT Technologies has been the worldwide leader in trenchless technology. TT Technologies complete line of trenchless equipment includes: piercing tools¸ pneumatic¸ static and lateral pipe bursting systems¸ pipe ramming tools¸ constant-tension winches¸ and directional drills. C-4-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Failing 96-in. Diameter CMP Replaced Utilizing Pipe Ramming Technology
Michael Roeling BKP Berolina Polyester GmbH & Co. KG Since 1980 M. Roeling worked as a construction site manager¸ technical manager and CEO in different contracting companies for all kind of utilities¸ using all kinds of installation technologies but mostly no-dig methods. He has a degree (Dipl.-Ing.) in civil engineering. C-3-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM A New UV Sensor Method for Sewer Renovation
David Rosenberg Insituform Technologies¸ Inc. E-3-05 Tuesday, March 13 – PM Sessions 5:10 PM Using CIPP Lining and Cathodic Protection to Rehabilitate and Protect Water Lines
Paul Ross CDM E-4-02 Tuesday, March 13 – PM Sessions 3:55 PM The Benefits of Post-construction Warranty Inspections for Long-term Sanitary Sewer Overflow Control Program Success
Blake Rothfuss Jacobs Associates E-5-05 Tuesday, March 13 – PM Sessions 5:10 PM Condition Assessment of Conveyance Tunnels – Effective Approaches to Managing Reliability
Daniel Rydberg City of Oxnard D-4-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pipe Bursting and Sliplining Reach New Levels of Production in the City of Oxnard¸ California, Through New Innovative Design, Planning, Equipment and Construction Methods
Rick Ryon W.L. Hailey Rick Ryon is the project superintendent for W.L. Hailey & Co. Inc¸ based in Nashville¸ Tennessee E-2-02 Tuesday, March 13 – PM Sessions 3:55 PM Installation of Two Water Tunnels Through Limestone Using a 60-in. Diameter Hard Rock Shielded TBM
GURDIP SAINI NYC Department of Design and Construction I work as Assistant Commissioner of Infrastructure Design as head of In-House Design Bureau responsible for the design and bidding of sewer¸water main and highway projects throughout the City of New York. Most of the design work is done utilizing highly talented and experienced engineering staff. C-2-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Microtunneling of Large Diameter Watermain in Hard Rock-Manhattan, City of New York
Piero Salvo, P.Eng., M.Eng. GENIVAR A-6-02 Monday, March 12 – AM Sessions 9:55 AM City of Leduc – Case Study Comparison between Conventional CCTV Sewer Inspection and 360 Degree Digital Pipe Scanning Technology
    F-6-01 Wednesday, March 14 – AM Sessions 8:00 AM Northwest Arm Trunk Sewer Rehabilitation – Case Study
Barry Sarin CDM Smith D-1-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Multiple HDD Applications, Portland Airport Deicing Enhancement Project
Timothy Schneller¸ P.E. George Butler Associates¸ Inc. Over the last 10 years¸ Tim Schneller has led the design of nearly 54 miles of interceptor sewer ranging in size from 8" to 60". Through these projects¸ Tim has managed the design of over 12¸000 feet of pipe installed via trenchless technologies with sizes up to 88" diameter tunnels. E-2-04 Tuesday, March 13 – PM Sessions 4:45 PM Tunneling Under the Overland Park Arboretum
Jeffrey M. Scholl¸ P.E. J. D. Hair Associates A-1-03 Monday, March 12 – AM Sessions 10:20 AM Installation of Three Parallel Electric Ductbanks beneath the Chelsea River Using Horizontal Directional Drilling in Boston/Chelsea¸ Massachusetts
John P. Schroeder¸ P.E.¸ BCEE CDM John Schroeder is CDM’s national conveyance market leader & trenchless tech¸ leader. He is a NASSCO PACP master trainer and on the NASSCO Board of Directors. With 20 yrs of experience¸ he provides technical leadership on numerous pipeline assessment and rehabilitation projects across the country. A-6-04 Monday, March 12 – AM Sessions 10:45 AM Identifying¸ Removing and Documenting Inflow/Infiltration Reduction
      D-5-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM If Finding and Removing I/I Were Easy
Giovanni Scotto Northeast Remsco F-2-03 Wednesday, March 14 – AM Sessions 8:50 AM Support of Tunneling with Chemical Grouting in New Jersey
Ariamalar Selvakumar U.S. Environmental Protection Agency (EPA) F-4-02 Wednesday, March 14 – AM Sessions 8:25 AM Evaluation of the Carbon Footprint of Innovative Watermain Rehabilitation Technologies vs. Open-cut
Michael Sharp¸ PE URS Corporation C-4-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Estimating Hammer Stresses for Pipe Ramming and HDD Assists
Ad Shatat Russell NDE Dr. Shatat is in charge of R&D for Russell NDE and PICA Corp. USA. A-6-05 Monday, March 12 – AM Sessions 11:10 AM NDE Techniques for Water and Wastewater Pipe Condition Assessment
James Shelton Malcolm Pirnie Jim Shelton is National Practice Leader for Condition Assessment and Rehabilitation of Buried Infrastructure in the US and as Global Knowledge Leader for Trenchless Technologies for the larger Arcadis organization. He has been New Castle County’s $350M Brandywine Hundred Sewer Rehab Program Manager B-4-01 Monday, March 12 – PM Sessions 3:45 PM Lateral Rehabilitation Options and Their Cost-benefit comparison – One Utility’s Perspective
      F-3-03 Wednesday, March 14 – AM Sessions 8:50 AM Cured-in-place Liner Defects – Three Studies of Installed Liner Performance Quality
Jim Shelton Malcolm Pirnie B-5-03 Monday, March 12 – PM Sessions 4:35 PM Laser Profiling – A Case Study in Field Accuracy
Jadranka Simicevic Trenchless Technology Center/CH2M Hill A-4-02 Monday, March 12 – AM Sessions 9:55 AM Review of QA/QC Procedures Associated with Rehabilitation of Large Diameter Interceptors
    C-6-01 Tuesday, March 13 – AM Sessions (1st Session) 8:00 AM Interactive Web Portal for Supporting Decision Making Related to Technical¸ Financial and Legal Issues
Sunil Sinha¸ PhD Virginia Tech E-1-04 Tuesday, March 13 – PM Sessions 4:45 PM Water Pipeline Deterioration Prediction Utilizing a Markov Chain Methodology
    F-4-04 Wednesday, March 14 – AM Sessions 9:15 AM Baseline Condition Data Collection for Pipes and Pipeliners
Gary Skipper¸ PE Brown and Caldwell B-5-01 Monday, March 12 – PM Sessions 3:45 PM Hydraulic Analysis¸ Inspection and Condition Assessment of the City of San Diego PS65 Force Main
Adam Slifko RedZone Robotics C-5-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Pipeline Inspection and Locating
CDM Smith CDM Smith D-1-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Multiple HDD Applications, Portland Airport Deicing Enhancement Project
Monika Smoczynski¸ PE City of San Diego Brown and Caldwell’s national Underground Infrastructure Management Community of Practice leader with 30 years of combined engineering¸ construction¸ flow monitoring¸ inspection¸ and condition assessment of water supply¸ wastewater collection¸ stormwater drainage¸ and industrial waste systems. B-5-01 Monday, March 12 – PM Sessions 3:45 PM Hydraulic Analysis¸ Inspection and Condition Assessment of the City of San Diego PS65 Force Main
James J.Smolik City of Westlake¸ Ohio C-3-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Lessons Learned During Sewer Rehabilitation on Public and Private Property
Ron Snoddon City of Calgary Water Services Supervisor for City of Calgary Water Service with 32 years field experience installing and repairing water and sewer systems. F-3-04 Wednesday, March 14 – AM Sessions 9:15 AM Trenchless Sewer Lateral Rehabilitation Pilot Project in Calgary, Alberta
Nate Soule Brierley Associates¸ LLC C-2-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Unconventional Subsurface Investigation Methods for Tunnel/Trenchless Projects
Kimberlie Staheli Staheli Trenchless Consultants Kim Staheli is a trenchless technology specialist with an 18-year background including both consulting engineering and engineering for construction contractors. She is the President and Principal Engineer of Staheli Trenchless Consultants. D-1-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Constructing Twin 24-in. Force Mains in a Highly Sensitive Environment Utilizing HDD
      D-1-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Tulalip Tribe and City of Everett Bring Regional Water to the Pacific Northwest with Massive HDD Project
Andy Stanton Black & Veatch Corp. D-4-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pipe Bursting and Sliplining Reach New Levels of Production in the City of Oxnard¸ California, Through New Innovative Design, Planning, Equipment and Construction Methods
Jennifer Steffens¸ PE Pure Technologies¸ Ltd. Pure Technologies is a world leader in the development and application of innovative non-destructive technologies for inspection¸ monitoring and management of critical infrastructure including water and wastewater force mains. Pure provides specialized engineering services for condition assessment. A-6-01 Monday, March 12 – AM Sessions 9:30 AM Methods for Non-destructive Evaluation of Force Main Condition and the Associated Cost Benefits
Glynda Steiner Seattle Public Utilities A-2-01 Monday, March 12 – AM Sessions 9:30 AM Challenges and Success of Open Shield Pipe Jacking Construction in a Congested Neighborhood
Nick H. Strater, P.G. Brierley Associates¸ LLC Nick has over 16 years of engineering geology and geotechnical experience¸ and has served as senior engineering geologist and project manager for a large variety of projects. Specialties include rock and soil tunnels¸ directional drilling¸ rock slope design and remediation¸ and forensic geology. A-1-02 Monday, March 12 – AM Sessions 9:55 AM Franklin Falls – The Toughest Trenchless Crossing in New Hampshire
      B-2-02 Monday, March 12 – PM Sessions 4:10 PM Challenges and Lessons Learned of Pilot Tube Guided Auger Boring Utility Crossings of the Little River
Troy Stokes Akkerman Inc. B-2-03 Monday, March 12 – PM Sessions 4:35 PM Extensive Small Diameter Pipe Jacking with Concurrent Methods Under the I-15 Core in Provo¸ Utah
John J. Struzziery¸ P.E. Kleinfelder/S E A John has over 37 years experience in the planning¸ design and construction of heavy/civil infrastructure projects and has been active in the trenchless industry for over 30 years. John is the program manager for a $300M sewer separation and stormwater management project in Cambridge¸ MA. B-2-02 Monday, March 12 – PM Sessions 4:10 PM Challenges and Lessons Learned of Pilot Tube Guided Auger Boring Utility Crossings of the Little River
Eric Sullivan RapidView-IBAK North America An experienced operator and sales representative in the pipeline inspection industry¸ Eric develops the market for RapidView’s unique technologies in the Western US & Canada. Active in the industry¸ Eric holds a PACP/ LACP/MACP certification & has written for many industry periodicals. D-5-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Manhole Inspection: Way Beyond Surface Level
Curtis Tanner¸ PE URS Corporation C-4-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Estimating Hammer Stresses for Pipe Ramming and HDD Assists
Dornelle Thomas CDM Ms. Thomas serves as a project engineer with CDM on various water and wastewater related projects. Her project experience includes water quality evaluations at wastewater treatment plants¸ hydraulic evaluations and calculations¸ I/I studies¸ sewer assessment and pipeline rehabilitation. A-6-04 Monday, March 12 – AM Sessions 10:45 AM Identifying¸ Removing and Documenting Inflow/Infiltration Reduction
Jay Thomas STRUCTURAL F-4-01 Wednesday, March 14 – AM Sessions 8:00 AM Pipeline Repair Technologies, Current and Future
John Thompson LiquiForce A-1-05 Monday, March 12 – AM Sessions 11:10 AM Pittsfield Township Watermain Rehabilitation and Replacement Case Study
Fred Tingberg Lanzo Lining Services Principle and chief spokesperson at Lanzo Lining Services an independent Installer of CIPP since 1993. Lanzo has installed over 7¸000¸000 lf of CIPP throughout the United States and Canada E-1-02 Tuesday, March 13 – PM Sessions 3:55 PM A Sure Bet at Greektown Casino
John Paul Travis Malcolm Pirnie John Paul Travis has been with Malcolm Pirnie’s Buried Infrastructure Management group for nine years. He has worked on many buried infrastructure projects for various municipalities nationwide. His work has ranged from rehabilitation design to SSES associated field activities. B-5-03 Monday, March 12 – PM Sessions 4:35 PM Laser Profiling – A Case Study in Field Accuracy
Jeff Twardzik Philadelphia Water Department Jeff has 17 years experience with the Philadelphia Water Department and has designed and managed projects using trenchless techniques for 13+ years. E-1-03 Tuesday, March 13 – PM Sessions 4:20 PM Caught Between a Bridge and a River
Michael Tyrrell TRC A-1-03 Monday, March 12 – AM Sessions 10:20 AM Installation of Three Parallel Electric Ductbanks beneath the Chelsea River Using Horizontal Directional Drilling in Boston/Chelsea¸ Massachusetts
Craig Vandaelle Michels Canada Co. Craig Vandaelle is a Project Manager with Michels Canada and is currently running an HDD project in Vancouver¸ BC. Craig has been with Michels since 2008 and in that time has managed a number of tunnelling and HDD projects on the West Coast. C-1-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Vancouver City Central Transmission Project – Horizontal Directional Drilling and Supply and Installation of High Density Polyethylene Duct
      F-1-05 Wednesday, March 14 – AM Sessions 9:40 AM Thermal Grouting of BC Hydro’s VCCT Project
Andrew S. Vane¸ PE Hazen and Sawyer¸ PC Mr. Vane is a senior principal engineer in Hazen and Sawyer’s Charlotte office specializing in utility line design and construction administration for projects throughout the Carolinas. In his spare time¸ he and his wife homeschool their 4 children. A-2-02 Monday, March 12 – AM Sessions 9:55 AM Charlotte’s Paw Creek Force Main Project
Michael Vargo Prime Resins¸ Inc Michael resides in Atlanta¸ GA . For over 20 years Michael has enjoyed the challenge of helping Owners¸ Engineers¸ and Contractors design a variety of solutions for stabilizing soils¸ stopping leaks¸ and protecting structures around the world. C-2-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Chemical Grout – The Settlement Solution for Microtunneling
Brandon Vatter Nothern Kentucky Sanitation District No. 1 F-2-02 Wednesday, March 14 – AM Sessions 8:25 AM The Axis of New Trenchless Technology
Travis Wagner¸ PE Pure Technologies¸ Ltd. Pure Technologies is a world leader in the development and application of innovative non-destructive technologies for inspection¸ monitoring and management of critical infrastructure including water and wastewater force mains. Pure provides specialized engineering services for condition assessment. A-6-01 Monday, March 12 – AM Sessions 9:30 AM Methods for Non-destructive Evaluation of Force Main Condition and the Associated Cost Benefits
    D-5-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Implementing Inertial Navigation Technologies
Erika Waite City of Hamilton C-5-02 Tuesday, March 13 – AM Sessions (1st Session) 8:25 AM Direct Benefits of Undertaking Multi-sensor Inspections for Large Diameter Sewers
Ed Walker¸ P.E. Barge Waggoner Sumner & Cannon F-3-05 Wednesday, March 14 – AM Sessions 9:40 AM 96-in. Brick Nashville CSO Outfall Relined After Flood Damage
Matthew Wallin Bennett Trenchless Engineers A-1-04 Monday, March 12 – AM Sessions 10:45 AM Improving the Standard of Mud Management
Matthew Wallin Bennett Trenchless Engineers Matthew Wallin is a Senior Project Engineer with Bennett Trenchless Engineers¸ and has over 9 years of experience in trenchless design and inspection. B-1-01 Monday, March 12 – PM Sessions 3:45 PM 50 Ft. of Peat – Design Challenges of Three HDD Crossings of the Sacramento River
Matt Wassam SAK Construction¸ LLC Matt Wassam is SAK’s Business Development Leader for the water markets. He has been in the pipeline rehabilitation industry for seven years and has been instrumental in some of the nation’s largest trenchless water rehabilitation projects. E-3-02 Tuesday, March 13 – PM Sessions 3:55 PM Trenchless Rehabilitation of Pressure Pipelines
Tracy Weaver Portland Utilities Construction Co.¸ LLC Tracy Weaver has 15 years in the construction industry. She is in charge of safety for the company and all contract documents¸ procedures¸ submittals and billing. Ms. Weaver completed an Associates Degree from Western KY University and assisted in formation of TN Utility Contractors Association. D-4-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Pipe Bursting Pressurized Waterlines – To Burst or Not to Burst
Damien Wetzel Stantec As a Stantec Associate¸ Damien is responsible for being the Client Manager on projects and assists project managers in directing technical teams. He currently serves as Township Engineer for Pittsfield Township¸ Ann Arbor Township¸ and Putnam Township. A-1-05 Monday, March 12 – AM Sessions 11:10 AM Pittsfield Township Watermain Rehabilitation and Replacement Case Study
Rick Wheadon Carollo Engineers C-5-04 Tuesday, March 13 – AM Sessions (1st Session) 9:15 AM Risk-based Condition Assessment of Aqueduct Pipelines Using Multiple Inspection Technologies
L. Grant Whittle Virginia Tech Grant Whittle has been involved with the trenchless technology industry for more than 15 years. He served multiple terms on the Boards of NASSCO. He is currently pursuing a M.S. in Environmental Science and Engineering¸ pursuant to a PhD in Construction. F-4-04 Wednesday, March 14 – AM Sessions 9:15 AM Baseline Condition Data Collection for Pipes and Pipeliners
Dan Willems City of Saskatoon A-5-01 Monday, March 12 – AM Sessions 9:30 AM St. Albert CCTV Inspection and Sewer Rehabilitation Program
Charles Wilson Hazen and Sawyer Mr. Wilson is an Associate with Hazen and Sawyer¸ working on various wet weather collection system projects including CSO management and sewershed studies and designs. He has a BS in Civil Engineering from UNH¸ and an MS in Civil and Environmental Engineering from Tufts University. F-3-01 Wednesday, March 14 – AM Sessions 8:00 AM Old Pipe/Renewed Pipe – How New Technology Enhances the Rehabilitation of a 140-Year-Old Sewer
Travis E. Wilson¸ PE Littlejohn Engineering Associates¸ Inc Travis graduated from Tennessee Technological University with a Bachelor of Science in Civil Engineering. He has over 16 years of experience as a Project Manager and Project Engineer for sanitary sewer collection system projects. F-5-03 Wednesday, March 14 – AM Sessions 8:50 AM Flow Monitoring and I/I Reduction – Beyond Plain Vanilla
James Withers JRGO¸ LLC Mr. Withers is an engineering intern with a master’s degree in civil engineering and significant municipal engineering experience.. C-4-05 Tuesday, March 13 – AM Sessions (1st Session) 9:40 AM Case Studies in Regulatory¸ Legal and Design Issues in Pipe Bursting
Scott Woodbury Clean Water Services Scott Woodbury is a Project Manager and Civil Engineer with Clean Water Services Treatment Plant Services division. Scott oversees planning¸ design and construction of the District’s large pump stations and force mains. D-1-03 Tuesday, March 13 – AM Sessions (2nd Session) 11:10 AM Constructing Twin 24-in. Force Mains in a Highly Sensitive Environment Utilizing HDD
Michael E. Woodcock Portland Utilities Construction Co.¸ LLC Michael Woodcock has 15 years experience in the construction industry. He has a Masters in Business Administration and a finance degree from Western KY University. Michael collaborated in developing Portland’s pipe bursting division into the 3rd most experienced in North America. D-4-01 Tuesday, March 13 – AM Sessions (2nd Session) 10:20 AM Pipe Bursting Pressurized Waterlines – To Burst or Not to Burst
Todd Wyman City of St. Albert Todd Wyman is the Director of Engineering Services for the City of St. Albert. Under his leadership the City has taken on several challenging trenchless projects, including an annual program of inspecting, condition assessment and rehabilitation of the sanitary and storm sewer systems. A-5-01 Monday, March 12 – AM Sessions 9:30 AM St. Albert CCTV Inspection and Sewer Rehabilitation Program
Tao Xie Bowling Green State University C-6-03 Tuesday, March 13 – AM Sessions (1st Session) 8:50 AM Comparison of the Carbon Dioxide Emissions Between HDD and Open-cut in the Construction of One Mile Watermain and its Ancillary Structures
Michael Zantingh City of Hamilton Mike has held the position of Infrastructure Programming Technologist for the City of Hamilton for the past five years. E-3-03 Tuesday, March 13 – PM Sessions 4:20 PM Structural Rehabilitation of Aging Pipes – Does It Really Prevent Failures?
Renni Zhao, Ph.D., P.E. DCWATER A-5-03 Monday, March 12 – AM Sessions 10:20 AM Lesson Learned About External Corrosion That Lead to an Outfall Sewer Collapse
    E-5-02 Tuesday, March 13 – PM Sessions 3:55 PM Large Diameter Force Main Investigations – Two Level Approach
Fangyi Zhou S.M.A. Consulting Ltd. D-2-04 Tuesday, March 13 – AM Sessions (2nd Session) 11:35 AM Pilot Tube Microtunneling in City of Edmonton – Challenges and Successes
Junhao Zou Design & Construction¸ City of Edmonton Junhao Zou is a senior engineer with the Drainage Services of the City of Edmonton. He got his bachelor’s degree in Civil Engineering from Tsinghua University in China. Mr. Zou completed a Master of Science degree in Construction Engineering and Management at the University of Alberta. D-3-02 Tuesday, March 13 – AM Sessions (2nd Session) 10:45 AM Lining of a 2.4-m ID Inverted Syphon Tunnel for Zero Leakage
Kas Zurek City of Winnipeg A-3-05 Monday, March 12 – AM Sessions 11:10 AM 34 Years of Quality Assurance Testing for CIPP in Winnipeg, Manitoba