Monday, March 12 – PM Session

Track 1

(B-1-01 to 04)
Horizontal Directional Drilling
Richard (Bo) Botteicher, Underground Solutions Inc.

Track 2

(B-2-01 to 04)
Pilot Tube Microtunneling
Michelle Ramos, GeoEngineers, Inc.

Track 3

(B-3-01 to 04)
Cured-in-Place (CIPP) Lining
Kaleel Rahaim, Interplastic Corp.

Track 4

(B-4-01 to 04)
Lining Materials, Methods & Installation
George Kurz, Barge, Waggoner, Sumner & Canon

Track 5

(B-5-01 to 04)
Condition Assessment & Pipeline Inspection
Dorian Modjeski, Cardon TBE

3:45 PM 50 Ft. of Peat – Design Challenges of Three HDD Crossings of the Sacramento River Guided Boring and the Lafayette/Pleasant Hill Road Trunk Sewer Non-styrene Options for Cured-in-Place Pipe Lateral Rehabilitation Options and Their Cost-benefit Comparison – One Utility’s Perspective Hydraulic Analysis, Inspection and Condition Assessment of the City of San Diego PS65 Force Main
4:10 PM Planning, Extensive Monitoring and Good Communication Solves Public Noise Concerns on Two Large HDD Crossings in Sundre, Alberta Challenges and Lessons Learned of Pilot Tube Guided Auger Boring Utility Crossings of the Little River Hydrophilic Gasket Sealing Technology – A Solution to Deficiencies in Cured-in-place Pipe Lining High Temperature Aeration Piping – How Can I Rehabilitate It? Robotic Inline Inspection of Unpiggable Natural Gas Pipeline with Explorer
4:35 PM Goathead Creek Crossing Extensive Small Diameter Pipe Jacking with Concurrent Methods Under the I-15 Core in Provo, Utah Malibu Force Main Rehabilitation Cranking up the Delivery – City of Richmond 2011 Sanitary Sewer Lining Project Laser Profiling – A Case Study in Field Accuracy
5:00 PM Challenging HDD Watermains Up Steep Slopes Shively Interceptor The Next Generation of UV Curing CIPP Technology: Designed in America, Made in America Line Q3 Pipeline – Slipline Rehabilitation Are Sewer Lateral Inspections Cost-effective?