Monday, March 12 – AM Session

Track 1

(A-1-01 to 05)
Horizontal Directional Drilling
Brian Avon, Carollo Engineers

Track 2

(A-2-01 to 05)
Auger Boring
Matt Pease, Staheli Trenchless Consultants

Track 3

(A-3-01 to 05)
Cured-in-Place Pipe (CIPP) Lining
Joe Lane, SAK Construction LLC

Track 4

(A-4-01 to 05)
Current Trenchless Research
Alan Atalah, Bowling Green State University

Track 5

(A-5-01 to 05)
Asset Management
Marc Lehmann, CDM

Track 6

(A-6-01 to 05)
Condition Assessment
Ernie Ting, Town of Markham

9:30 AM Directional Drilling in Mukilteo – Lessons Learned from an HDD with 330-ft. of Elevation Difference Challenges and Success of Open Shield Pipe Jacking Construction in a Congested Neighborhood Just in Time Rehabilitation of Twin Steel Sewer Siphon An Innovative Alternative – Buoyant Interceptor in a Lake St. Albert CCTV Inspection and Sewer Rehabilitation Program Methods for Non-destructive Evaluation of Force Main Condition and the Associated Cost Benefits
9:55 AM Franklin Falls – The Toughest Trenchless Crossing in New Hampshire Charlotte’s Paw Creek Force Main Project Back to the Future – The Modernization of A Historic Mill Village Community Review of QA/QC Procedures Associated with Rehabilitation of Large Diameter Interceptors Condition Assessment and Management of Critical Watermains in the City of Ottawa City of Leduc – Case Study Comparison between Conventional CCTV Sewer Inspection and 360 Degree Digital Pipe Scanning Technology
10:20 AM Installation of Three Parallel Electric Ductbanks beneath the Chelsea River Using Horizontal Directional Drilling in Boston/ Chelsea, Massachusetts Microtunneling Gives Way to Auger Boring on Challenging Drive Rehabilitation of a Hydraulically Limited Sewer 30-Feet Deep Under Interstate-5 Assessment of Corroded Corrugated Steel Culverts Using Field Data Lesson Learned About External Corrosion That Lead to an Outfall Sewer Collapse Decision Logic for Selecting Wastewater Force Main Inspection Program Tools
10:45 AM Improving the Standard of Mud Management Redesigning for Success – A Challenging Sewer Installation in Kirkland¸ Washington Innovative CIPP Relining Methods Reduce Open-cut Spot Repairs in Edmonton LinerRite – An Optical-Based Sensor for QC of Wet-Out Operations of CIPP Liners Advances in Water Pipeline Condition Assessment Identifying¸ Removing and Documenting Inflow/Infiltration Reduction
11:10 AM Means and Methods of Construction – Whose Domain is it? 34 Years of Quality Assurance Testing for CIPP in Winnipeg, Manitoba Investigating Cross Bores in the Wastewater Collection System Applying Risk Management and Financial Analysis to Asset Management Planning NDE Techniques for Water and Wastewater Pipe Condition Assessment