No-Dig Show 2009
Register
Hotel Information
NASTT Membership
Conference Preview
Register
Sign up to receive NASTT updates delivered straight to your inbox.
Your Email Address:

2008 Session Schedule

Technical Paper Sessions

The No-Dig technical paper program is driven and developed by a group of NASTT members, known as the Program Committee, who work diligently to provide attendees with a high quality and educational experience. You can choose to attend from among 110 of the most interesting and compelling papers, all of which have been carefully peer-reviewed for relevance, usefulness and non-commercialism, and make a long-lasting contribution to the state-of-the-art of trenchless technologies. From new installation to rehabilitation methods, the scope of the subject matter presented offers something for everyone. No-Dig papers are presented in a 4-track schedule, allowing you to choose from among four paper presentations at any given time. Papers are mostly arranged by subject area. Whether you are planning to attend the full conference or one day only, you select the paper presentations you wish to attend!

-Sort Papers by Date of Presentation
-Sort Papers by Track & Topic
-Download the Entire Paper Schedule (PDF format) *As of 2/26/08


View Papers by Date of Presentation:

Monday, April 28 - AM Sessions
Monday, April 28 - PM Sessions
Tuesday, April 29 - AM Sessions (1st Session)
Tuesday, April 29 - AM Sessions (2nd Session)
Tuesday, April 29 - PM Sessions
Wednesday, April 30 - AM Sessions

View Papers by Track & Topic:

Track One
  • Long-term Performance of FRP Rehabilitated Piping Components
  • The 2007 ASTM F1216 Liner Design Change
  • Rehabilitation of a 75-inch Diameter Brick Interceptor in Cleveland
  • Liner Long-term Performance Life Prediction Using Critical Buckling Strain
  • 3D Modeling of Pipe Liners with Local Defects
  • Rehabilitation of 60-inch Failing Brick Sewer Pipe in Cleveland Ohio
  • Large Diameter CIPP Rehabilitation on King Edward Avenue in Ottawa
  • Fast Track Assessment and Rehabilitation Design for Sewers in Las Vegas Valley
  • The City of Los Angeles’ Benchmarking Study of CIPP Structural Liner Thickness
  • CIPP Using Air and Steam
  • Applications of Geopolymer Concrete in the Rehabilitation of Wastewater Concrete Structures
  • New Developments in Liner Design Due to ATV-M 127-2
  • Using Automatic Controls in Temporary Bypass Applications
  • Root Control: A Study in Planning¸ Performance and Patience
  • The Rehabilitation of Water Mains with Polyethylene Pipes and Liners: A Logical Choice
  • Cured-in-Place Water Main Rehabilitation in Clinton Township, Michigan
  • Trenchless Plastic HDPE Water Main Solves More Than Water Loss
  • Fund Allocation Model for Replacement and Rehabilitation of Water Mains
  • Calvert Cliff Nuclear Power Plant Utilizes Trenchless Technologies Under Extreme and Challenging Conditions
  • Non-Circular Sewer Liner Installation and Future Projects in Los Angeles
  • Using Design-Build to Rehabilitate a Military Base Sewer System
  • Flower Street Sewer Project in the City of Los Angeles
  • Risks Associated with CIPP Lining of Storm Water Pipes and the Release of Styrene
  • Evaluation of DOT Practices in the United States for Rehabilitation of Transportation Drainage Structures
  • The Role of Preventative Maintenance in Establishing an Asset Management Program
  • Storm Sewer Rehabilitation Pilot Program: Results of Condition Assessment and Rehabilitation
  • Analyzing Risk and Cost to Society of Tunnel Alternatives
  • Enhancing Subsurface Characterization Through teh Use of 3D Underground Imaging
Track Two
  • PCCP Condition Assessment: Exploring Repair Solutions for Wichita Falls 54-inch Transmission Line
  • Planning and Executing Internal Inspections of Large Diameter PCCP Waterlines
  • Assessment of Pressure Pipelines
  • Evaluation into the Condition of the Sandhill-Lamb Transmission Main Pipeline
  • An Asset Management Strategy for Water Mains
  • Using GIS Tools to Identify and Summarize Recommendations from CCTV Sewer Assessments
  • Green Applications in the Sewer Rehabilitation Industry
  • Geophysical Tools for Underground Utility and Infrastructure Assessment
  • Construction Inspector Training Requirements for Trenchless Pipeline Renewal Projects
  • Assessment of Damage to Rigid Sewer Pipes and Erosion Voids and Design Implications
  • Assessment of CIPP Liner Performance in Contaminated Soils
  • SSO Abatement Program in the City of Brentwood¸ Tennessee
  • An Experimental Study of Soil Erosion Around Leaking Pipes
  • From Identification to Removal - A Case Study of a Successful I/I Removal Program
  • Blending Zoom Technology with Traditional CCTV in a Condition Assessment Program
  • Condition Management of Sewer Systems using both Zoom Camera Technology and Traditional CCTV
  • Application of Inline Acoustic Leak Detection For Condition Assessment of Large Diameter Force Mains
  • The Upgrade and Modernization of Sewer Networks in New Delhi
  • Field and Laboratory Study on Potable Water Renewal Using Cement Mortar Linings
  • Epoxy Water Main Rehabilitation
  • Quebec City Uses CIPP to Structurally Rehabilitate a 100-Year Old Water Main
  • Close-Fit Water main Renovation in Calgary
  • Developing Process, Procedures and Testing of a CIPP Liner for Rehabilitation of a Large Watermain
  • Integrated Leak Detection at Dallas Water Utilities
  • Case Studies for Free-Swimming Acoustic Leak Detection System
  • Planning the Rehabilitation of the LVVWD Distribution Network Using CARE-W
  • Slip-Lining 42-inch Water Transmission Main
  • Developing Process, Procedures and Testing of a CIPP Liner for Rehabilitation of a Large Water Main in the City of Montreal
Track Three
  • Step-by-Step Evaluation of Hydrofracture Risks for HDD Projects
  • Determination of Safe Pulling Loads on Fusible PVC During HDD
  • Soil Reaction to the HDD Process
  • HDD Construction Risks and Challenges on the King County Bellevue Pump Station Force Main Project
  • Alternative Contract Procurement Using HDD Solves Regulatory Dilemma
  • Horizontal Directional Drills in Telecommunications
  • Determining the Economic Viability of Directional Drilling
  • HDD Through an Existing Landfill and Coarse Alluvium in Glendale¸ Colorado
  • New Pipeline Construction for Alberta Oilsand Expansion
  • Operation of Obstacle Detection GPR Designed for Use on HDD Machines
  • Soil Response Considerations During HDD
  • Large Diameter HDD Pipe Installations and HDD Assist Techniques
  • HDD Design & Execution: Intersect Drill with Significant Elevation Change and Artesian In-Flow
  • Finding Obstacles During HDD Operations
  • Pipe Bursting - Alternative Delivery Builds Positive Public Relations
  • Completing An Emergency Pipe Burst on Mercer Island
  • Drilling Instead of Digging: Separating the Scripps Institution Combined Outfall System
  • The Secession Golf Course Effluent Force Main Project: Expanding Thermoplastic HDD Applications
  • Lateral Pipe Bursting Focus for I/I in Sanitary Sewer Systems
  • The Next Generation of Lining Sewer Laterals
  • Paper To Be Determined
  • Paper To Be Determined
  • Paper to Be Determined
  • UV Curing for Natural Gas Liners
  • Combining Trenchless Pipe Splitting & Keyhole Technologies
  • Development of a “Smart” Impact Mole to Support Keyhole Construction
  • Working Outside the Right-of-Way: Social¸ Political¸ and Legal Implications
  • Why Partnerships Amoung Public Works Agencies, Universities and Industry Make Sense
Track Four
  • Design Challenges with New York City's Newest Water Tunnel: The Lesser-known Trans-Hudson Crossing
  • Successful Design Selection for Underground Boring Equipment
  • Paper To Be Determined
  • Guided Boring Method Used to Stabilize 10-foot Diameter Storm Drain Tunnels
  • Battery Park Trunk Sewer Emergency Tunnel Project
  • Challenges in the Construction of the City of Edmonton's W12 Inverted Syphon Project
  • Tunneling Under the North Saskatchewan River: A Management Review
  • Paper To Be Determined
  • Hydraulic Analysis of a Corrugated Metal Pipe (CMP) CIPP-Lined Culvert
  • Differing Site Condition Claims and Trenchless Projects
  • Mitigating Microtunnel Launch and Reception Challenges
  • Analysis and Mitigation of Settlement Risks in New Trenchless Installations
  • Ballard Siphon Replacement Project
  • Paper To Be Determined
  • Rainbow Casino's Force Main Replacement Project
  • Pilot Tube Micro-Tunneling in Alaska
  • Seven Years in the Making: The Challenges¸ Successes and Lessons Learned of the Fairwood Interceptor
  • Innovative Technique for On-Grade Gravity Sewer Applications
  • Challenges to Microtunneling During the Implementation of WESS Stage W1 Project
  • Innovative Methods Tame Multi-Diameter Microtunneling Project
  • Emergency Design-Build Microtunneling
  • Geotechnical Aspects of Microtunneling and TBM Tunneling
  • Curved Microtunneling with Jackcontrol
  • Guaranteed Accuracy and Longer Drives: Using GBMs with Auger Boring Rigs
  • Novel Solutions for Successful Large Diameter Auger Boring Projects
  • Walnut Creek Annexation Project in Austin
  • Pneumatic Pipe Ramming For Sub Rail Line Drainage Casing Installations
  • Paper To Be Determined

 

Download Conference Brochure Register