 |
 |
 |
| Sign up to receive NASTT updates delivered straight to your inbox. |
|
|
|
|
2009 Session Schedule
| VIEW BY DATE OF PRESENTATION |
Monday, March 30
AM Sessions >> |
Monday, March 30
PM Sessions >> |
Tuesday, March 31
AM Sessions (1st Session) >> |
Tuesday, March 31
AM Sessions (2nd Session) >> |
Tuesday, March 31
PM Sessions >> |
Wednesday, April 1
AM Sessions >> |
| VIEW BY PAPER TITLE |
| Monday, March 30 – AM Sessions |
 City of Atlanta, Georgia Utilizes Ductile Iron Product Pipe on Large-Scale Static Pipe Bursting Project
 Pipe Bursting - A Fast Track Partner for Success
 Design-Build Innovations: Pipe Bursting Potable Water Mains with Pre-Chlorinated Pipe on Robins AFB
 Static Pipe Bursting Using Vitrified Clay Jacking Pipe in Phoenix Soils
 The Practical Study of Pipe Bursting by Expandit in Japan
 The Longest Drive - Portland’s CSO Microtunnels
 Intake Construction of Lake Nacimento, California
 27,500 Feet of Microtunneling Solves Complex Puzzle
in Sacramento
 Geotechnical Baseline Reports – Applying the Guidelines to Microtunneling
 A Microtunnel Crossing of a Highly Environmental Impact Area (Italy)
 Lateral Rehabilitation - Next Steps for the City of
Hamilton, Ontario
 Minimizing Inflow and Infiltration Through Trenchless
Lateral Replacement – A Municipal Perspective
 Service Connection Relining Pilot Program
 Examination of Lateral Replacement Program – A
Municipal Perspective
 Understanding ASTM F2561-06
 Economical Multi-Sensor Inspection of Collection
Systems
 Single Pass Multiple-Sensor Inspection of Large Sewers in the City of Toronto, Ontario
 Determining the Effectiveness of Using a Multiple-
Sensor Inspection Robot for Large Diameter Sewer Inspections
 CCTV inspection Companies – Why and How to
Accredit Them (France)
 Potholing Without Potholes: A Core Strategy for Utility Cut Repairs
 Water Main Asset Management in the City of
Hamilton, Ontario - A Comprehensive Overview of
Policies and Practices
 Establishing a Pathway for Achieving Water Utility
Infrastructure Management Excellence
 Scheduling Model for Water Main Rehabilitation
 City of Lima¸ Peru¸ Implements a Condition-Based
Asset Management Strategy (Peru)
 Asset Management of Crucial Transmission Lines to
the City of Guadalajara (Mexico)
|
| Monday, March 30 – PM Sessions |
 Comparison of Predicted and Observed HDD Installation Loads for Various Calculation Methods
 Small-Scale Hydraulic Fracture Experiments in a Frictional-Cohesive Material
 Trenchless Solution in the Oil Sands of Alberta – Saving Water and Reducing the Cost of Oil Extraction
 The ORFEUS Project: Design of a Bore-Head GPR for HDD Equipment (Italy)
 Rock Microtunneling – An Industry Review
 Microtunneling a RCP Sewer with Crossings
 Direct Pipe® Method - Latest Developments in Pipeline Construction (Germany)
 Real-Time Automated Solution to Positioning and Guidance of Microtunnel Boring Machines (P. R. China)
 Filling the Information Void on Annular Space Grouting
 Restoration of a Trunk Sewer Through Historic Kingston, Ontario
 Pipe Line Grouting - What Engineers and Contractors Need to Know to Make it Work
 Restoration Method of Pipeline Position (Japan)
 Nashville Project Shows Long-Term Effectiveness of Sewer Rehabilitation for Infi ltration Reduction
 A GIS-Based Decision Support System for Evaluating Costs and Benefits of Sewer Renewal Technologies
 Rehab Effectiveness - Why Holistic Rehab is Required for Signifi cant I&I Reductions
 Transmission Main Leak Detection in Sub-Saharan Africa (Africa)
 City of Baltimore, Maryland Outfall and Outfall Relief Sewer Condition Assessment
 USEPA Evaluates Controlled Condition Testing for Buried Pipeline Assessment and Rehabilitation
 Systematic Approach to Comprehensive Industrial Sewer Upgrades
 Development of Standard Water and Wastewater Pipe Condition Index
|
| Tuesday, March 31 – AM Sessions (1st Session) |
 Auger Boring Challenges in the Virgin Islands
 Small Boring Unit – A Ground-Breaking Alternative to Hand-Dig Installations in Hard Soil Conditions
 Field Challenges and Sucesses with Pilot Tube Microtunneling
 The First Major Pilot Tube Microtunneling Project in the St. Louis Metropolitan Area
 Use of an Optically Guided Downhole Hammer to Complete Trenchless Installation of Electric Cable
 Tunnel Construction Issues with San Francisco’s New 44-in. Water Main
 Tunneling the A-Line
 Design Constraints and Construction of Colorado Avenue and Ocean Avenue Trunk Sewer
 PVC Liner for Corrosion Protection in Large Diameter Segmental Sewer Tunnel
 Application of a Rectangular Pipe Jacking machine for Box Culvert Pipeline Construction (Japan)
 1-MN-320 Emergency Sliplining Project
 Brooks Bridge Waterline Rehabilitation
 City of Hamilton’s 3-Year CIPP Water Rehabilitation Program
 Low-Impact Water Main Rehabilitation in Kelowna, British Columbia
 Folded PE Liner Pipes - A New Frontier for Trunk Water Mains (UK)
 Coastal Noise - An Acoustical Evaluation of a Pre-Stressed Concrete Cylinder Pipe Force Main
 Reliability Assessment of Water Distribution Networks
 Live PCCP Inspection Using a Free-Swimming Tool
 No Interruption - Leak Detection Survey of a 42-in. Sewer Forcemain
 The Revival of a PCCP Pipeline In Taiwan (Taiwan)
 USEPA Research on Condition Assessment of Wastewater Collection Systems
 The Need for and Benefits of a Minimum Wall Thickness Requirement for Pipeliners (United Kingdom)
 The New Mandrel Testing – Laser Profi ling and Its Use In Rehabilitation and Construction
 Aqualiner – A New Process for the Lining of Water and Sewer Pipes
 Aptos Transmission Main Relocation Project in the Santa Cruz County Sanitation District
|
| Tuesday, March 31 – AM Sessions (2nd Session) |
 Trenchless Rehabilitation of a Trenchless Installation
 Pipe Ramming a 60-in. Casing Under BART
 Pipe Ramming and the Oil Pipeline Industry
 On-Grade Large Diameter Pipe Ramming Installations
 Contingency Planning for Microtunneling and Trenchless Projects
 Prism – An Automatic Measuring Technology for Non-Man Entry, Long and Curved Microtunneling (Japan)
 Modeling the Behavior of Microtunneling Due to Steeering Corrections (The Netherlands)
 Mircotunneling in Marginal Grounds - Design and Construction Risks Issues
 Designing Liners for Fully Deteriorated Sewers (Germany)
 Loadings Due to Traffi c Considered in Design of Trenchless Rehabilitation of Sewage Pipes (Poland)
 Quality Assurance of Close-Fit Liners (The Netherlands)
 Testing the Infl uence of Longitudinal and Transversal Cracks on Load Capacity of Trolining Liners (Poland)
 Methodology for Calculating the Carbon Footprint of Underground Utility Projects
 How to Take Advantage of Green Thinking to Get More Funding for Infrastructure
 EPA Support of Technology Development for Rehabilitation
 Service Connections Upgrade on a Structurally Rehabilitated Water Main
 Utilizing XYZ Mapping to Ensure a Successful Sliplining Project
 Effective Use of SUE on Trenchless Technology Infrastructure Projects
 Underground Mapping - Adding Value to Trenchless Technology Projects
 Mapping Underground Assets with Fully Innovative GPR Hardware and Software Tools (Italy)
|
| Tuesday, March 31 – PM Sessions |
 Advances in Gravity Sewer Installations Using HDD
 Does the HDD Reaming Pass Remove Extreme Alignment Dog-Legs?
 On-Grade Large Diameter Directional Drilling
 An HDD Project with a Considerable Entry and Exit Elevation Difference
 Installation of a New Sewer Line Up a Steep Hill Using HDD
 Selecting the Right Construction Method for a River Crossing
 Failure and Repair of Mather Drain Tunnel¸ SRCSD Bradshaw Interceptor Section 7B Mather in California
 The No Business Creek Tunnel - A Ground-Breaking Approach to Wastewater Collection
 Building a Large Diameter Deep Sewer Pipeline Under
Urban Constraints
 The Frictional Property of Lubricants and Its Impact on Soil-Pipe Interaction of Pipe Jacking (Taiwan)
 Hot Sewers - Experimental Evaluation of CIP Lining Systems for High Temperature Applications in Sewers
 72-in. Interceptor Lining in the City of Saskatoon, Saskatchewan
 Butterfield Storm Sewer CIPP
 Pressure Pipe CIPP for Potable Water Systems
 Recent International Developments in Testing of CIPP (UK)
 Evaluating In-Service Force Mains with Air Pocket and Leak Detection Technology
 Palos Hills: Case Study in Asset Management and Project Planning for Large-Scale CIPP Rehabilitation
 Innovative Free-Swimming Acoustic Method for Pipeline Leak Detection
 Integrated Project Delivery Method for Trenchless Projects
 Lessons Learned While Delivering Leak Detection Service on 150-km of Pipelines in Sao Paulo (Brazil)
 Advances in Underground Imaging
 A Real World Evaluation of Acoustic Inspection of Wastewater Force Mains
 Big Pipe and Big Challenges - Proven Effective Technologies
 The Mapping The Underworld Project (United Kingdom)
 An Innovative Rehabilitation Technique for Pipes Containing Cables (Japan)
|
| Wednesday, April 1 – AM Sessions |
 Design-Build Contract Minimizes Cost and Schedule for HDD Installation
 The St. John’s Water Co. Water System Improvement Project Using PVC in Difficult HDD Projects
 HDD Ram Assist Methods – Planning Ahead for HDD Success
 Rig Data Display and Transmission System
 One Project, Six HDDs – The Nacimiento Water Project
 Back-Loading Cutterheads - Improving Safety and Efficiency on Long Utility Crossings
 Study of the Construction of Rainwater Reservoir Facilities by the Unmanned Pneumatic Caisson Method (Japan)
 A Fundamental Study on the Reduction of Friction During Sewer Pipe Jacking (Japan)
 Property of Flyash Surfactant Injection into Over-Cutting Area as Lubricant for Slurry Pipe Jacking (Japan)
 Pipe Ramming Under Three Active Mainlines in Difficult Soil Conditions
 CIPP Rehabilitation of Failing Twin 72-in. Corrugated Metal Pipes
 Challenges and Lessons Learned Using Air Inversion and Stream Cure for CIPP Sewer Rehabilitation
 Styrene Removal Adds to the Challenges of Rehabilitating Large Diameter Sewer in Reno, Nevada
 Adopting UV Fiberglass CIPP in Sewer and Stormwater Rehabilitation Bid Specifications
 UV-Light Curing of CIPP with LEDs (Germany)
 City of Calgary, Alberta River Crossing Project Uses Flexible Tender Approach
 Pre-Qualifying Trenchless Rehabilitation
 Stability of Deteriorated Metal Culverts Including the Effect of Soil Erosion
 Practical Prescriptions on Environmental Stress Cracking Resistance of Polyethylene
 Partnering in No-Dig Projects and Reducing the Impact of Risks and Uncertainties (Denmark)
 Standard Pipe Infrastructure Data Model for Comprehensive Asset Management
 Opening up a VISTA of Buried Assets (United Kingdom)
 Advances in Pipeline Asset Management using Digital Side Scanning Evaluation Technology
 Innovative Trenchless Practices – The City of Edmonton, Alberta’s Perspective
|
|
|